You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS

    SBC: Berner, Lanphier & Assoc Inc.            Topic: N/A

    CURRENTLY COMMERCIAL SPACE-LAUNCH FREQUENCY REQUIREMENTS ARE MET IN THE 2200- TO 2300-MHZ BAND. NEW FREQUENCY ALLOCATIONS MAY LIMIT FREQUENCIES FOR COMMERCIAL SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS TO THREE CHANNELS IN THE 2360- TO 2390-MHZ BAND. THIS RESEARCH WILL ASSESS WHETHER THIS ALLOCATION IS SUFFICIENT TO ENSURE CONTINUED SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS. D ...

    SBIR Phase II 1996 Department of Transportation
  2. Phase II: EcoSod An Alternative Native Sod Solution for Highway Construction

    SBC: Bitterroot Restoration Inc.            Topic: N/A

    The Surface Transportation and Uniform Relocation Assistance Act requires the use of native grasses and wildflowers within highway corridors. A major problem for the revegetation industry has been the ability to predictably establish native vegetation from seed. The production of native sods would allow for the most sensitive period of establishment-germination and initial seedling growth-to be ...

    SBIR Phase II 2006 Department of Transportation
  3. Digital Waveform-based System for AE Measurement for NDT

    SBC: Dvp, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  4. Feasibility of and Techniques for CORSIM Model Computer-Based Training

    SBC: Pacific Animated Imaging            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  5. Dynamic Intrusion Sensing System Using a High Speed Low Cost 3D Camera

    SBC: Robotronics Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  6. Step Frequency Ground Penetrating Radar for Location and Evaluation of In-Roadway Sensors

    SBC: STARODUB INC            Topic: N/A

    A nondestructive evaluation method is proposed for imaging in-roadway sensors, anticipated to allow them to be located and evaluated in-situ. The technique uses innovative step frequency GPR hardware together with new data collection and data processing methods to provide high-resolution images of in-roadway sensor features. Recent work by the proposed research team has already demonstrated imag ...

    SBIR Phase I 2006 Department of Transportation
  7. Low Ground Clearance Vehicle Detection and Warning System

    SBC: ADVANCED TECHNOLOGY AND RESEARCH CORPORATION            Topic: 131FR1

    Highway-rail crossing, at which there is an unusually abrupt change in the level of the road's surface as it crosses the tracks, pose a risk of low ground clearance vehicles becoming stuck on the tracks. Advanced Technology and Research Corporation (ATR) proposes to develop an active detection and advance warning system. The system has three major functional componenets: measurement, decision, ...

    SBIR Phase I 2013 Department of Transportation
  8. Low Ground Clearance Vehicle Detection and Warning System

    SBC: Intelligent Automation, Inc.            Topic: 131FR1

    The problem of low ground clearance vehicles being stuck at tracks of highway-rail grade crossings (HRGC) poses a severe safety risk. Vehicles with long wheelbases and low ground clearance are more likely to be stuck on high-profile HRGCs. Currently there is no commercially available automated system that detects and computes the necessary critical dimensions of low ground clearance vehicles (LGCV ...

    SBIR Phase I 2013 Department of Transportation
  9. Low Cost Bridge Structural Monitoring Technology / Turning Structural Monitoring Data into Decision Making Information

    SBC: Intelligent Automation, Inc.            Topic: 081FH6

    This is a supplemental Phase II proposal submitted to DOT for additional funding and performance period extension of the on-going DOT Phase II project (contract # DTRT57-10-C-10027). The overall objective of the Supplemental Phase II effort is to complete the development of the sensor system capable of continuously monitoring the integrity of bridge structures, conduct field operation validation ...

    SBIR Phase II 2013 Department of Transportation
  10. Communicating Towed unit (Trailer) Vehicle Identification Number(s) (VIN) to the Powered Unit

    SBC: Intelligent Automation, Inc.            Topic: 121FM1

    Usually the lifetime of a trailer is much longer than tractors; tractors must work with a variety types and ages of trailers over the course of their use. In many scenarios (e.g., roadside inspection, border crossing, smart parking, connected vehicle initiative, etc.), it is necessary to identify trailer(s)' VIN(s) and know their sequences attached to the powered unit. An automated trailer VIN id ...

    SBIR Phase II 2013 Department of Transportation
US Flag An Official Website of the United States Government