You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Investigation of Molded Photovoltaic Case

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    Portable electronic equipment, whether military or civilian, now typically contain rechargeable batteries. Often it is inconvenient or impossible to connect this equipment to conventional battery charging sources. It would be highly desirable to incorporate a built-in battery recharging source with the equipment to overcome this shortcoming. Ideally this recharging source should not take up any ex ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  2. Transit Safety

    SBC: THE MACKINAC TECHNOLOGY COMPANY            Topic: 131FT1

    The Mackinac Technology Company is proposing to develop a novel antireflection film that will virtually eliminate the reflection of interior lighting on transit bus windshields and significantly improve driver visibility and passenger/pedestrian safety. Additives are incorporated into windshield glass to reduce solar glare during daylight hours. These additives have the unfortunate effect of in ...

    SBIR Phase I 2013 Department of Transportation
  3. Photovoltaic Case for Electrical Equipment

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    The objective of this project is to design, fabricate, and test a prototype photovoltaic (PV) case for electrical equipment used in field operations. The PV case could charge the equipment's batteries and/or directly operate low power equipment such as receivers and computers without a battery. The case would incorporate ECD's unique lightweight, flexible, and very rugged amorphous silicon PV modu ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  4. Investigation of Molded Photovoltaic Case

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  5. HIGHWAY FOG WARNING SYSTEM

    SBC: SENTEC CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  6. Offshore Wind Energy Resource Siting

    SBC: SEALANDAIRE TECHNOLOGIES, INC.            Topic: 911SG

    Over the last decade, it has been noted that offshore wind energy resource development could prove extensively valuable in many areas of our nation’s growth, including continued diversification of our energy supply, more options for cost-competitive electricity in coastal and Great Lakes regions, and economical stimulation through new and lasting infrastructure development. The challenges associ ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  7. Determination of the Onset of Widespread Fatigue Damage

    SBC: Qual-x, Inc.            Topic: N/A

    QUAL-X proposes to nondestructively inspect the extensive surface areas of aging commercial airliners for corrosion and fatigue damage. QUAL-X will characterize the above surfaces both at local and global areas of interest using chemical gas penetrants and advanced gas sensor techniques; both of which were developed as an extension of the company's unique and singular experience with the ket gas ...

    SBIR Phase I 1996 Department of Transportation
US Flag An Official Website of the United States Government