You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Developing a Standard Integrated Framework for Transit Assest Management Information

    SBC: Encada LLC            Topic: 131FT2

    Transit Agency Information required for managing Service centers on resources and assets that need to be available to operate the transit service as designed. An opportunity exists to design an Integrated Framework providing Service delivery and Maintenance Management Information to quantify the reliability and availability of the assets. This framework will incorporate modeling of the asset inven ...

    SBIR Phase I 2013 Department of Transportation
  2. Development of Manufacturing Technology for the Practical Application of Specialized and Environmentally Sensitive Nutrients, Enzymes, Immune-Stimulating Compounds and Biologics to Aquafeeds

    SBC: Zeigler Bros, Inc.            Topic: 823F

    In an effort to support the development of a domestic marine aquaculture industry, Zeigler Bros. Inc., (ZBI) proposes to continue its Phase I research by demonstrating the ability to scale up inclusion particle (IP) manufacturing. During Phase II ZBI will also demonstrate the efficacy of IOs for orally delivering phytase and probiotics to marine finfish. These efforts will directly address the p ...

    SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Motor Vehical Crash Costing Technology

    SBC: ARCCA, INC.            Topic: N/A

    With the advent of widely available PC technology, crash safety information can be cost-effectively disseminated to millions of people in an engaging and educational way. With an enticing and informative PC application, data about damages, costs, injuries and death can be personalized and grasped by anyone, particularily young drivers developing new driving behaviors. ARCCA's proposed system wil ...

    SBIR Phase I 1996 Department of Transportation
  4. Instrumented Anchor Pin for Heavy Truck Brake

    SBC: Stratcom International Llc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  5. Innovative Energy Absorbing Composite Utility Poles

    SBC: United Dynamics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  6. INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEM SIMULATION- IEMS(3)

    SBC: Data Communications Corp.            Topic: N/A

    THE PURPOSE OF THIS RESEARCH PROJECT IS TO DETERMINE THE FEASIBILITY OF MERGING AN EMERGENCY MEDICAL SERVICES (EMS) SIMULATOR WITH GEOGRAPHICAL INFORMATION SYSTEMS (GIS) IN ORDER TO PRODUCE IEMS(3) (INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEMS SIMULATOR), A PC-BASED SYSTEM WHICH CAN BE USED FOR BOTH ADDRESSING STRATEGIC PLANNING ISSUES OF EMS SYSTEMS (E.G., SYSTEM CONFIGURATION; VEHICLE LOCATION ...

    SBIR Phase I 1994 Department of Transportation
  7. ADVANCED MATERIAL CONCEPTS FOR GUARDRAIL END TREATMENTS

    SBC: United Dynamics, Inc.            Topic: N/A

    GUARDRAIL TERMINALS ARE SOME OF THE MORE TROUBLESOME AND POTENTIALLY HAZARDOUS ROADSIDE APPURTENANCES. RECENTLY DEVELOPED TERMINAL CONCEPTS WHICH HAVE PASSED CURRENT CRASH TEST CRITERIA TEND TO BE EXPENSIVE AND MAY REQUIRE EXCESSIVE LENGTH OF NEED, FLARE-OUT SPACE AND ADDITIONAL FILL AND GRADING. THIS PHASE I SBIR PROPOSAL ADDRESSES THE DEVELOPMENT OF A MORE EFFICIENT ENERGY ABSORBING TERMINAL CON ...

    SBIR Phase II 1994 Department of Transportation
  8. X-RAY DAMAGE THRESHOLD FOR FILM AND MAGNETIC RECORDING MEDIA

    SBC: United Dynamics, Inc.            Topic: N/A

    THE FEDERAL AVIATION ADMINISTRATION NEEDS STATISTICAL DATA ON THE X-RAY DAMAGE THRESHOLD OF PHOTOGRAPHIC FILM AND MAGNETIC MEDIA TO PREDICT POSSIBLE DAMAGING EFFECT OF HIGHER POWERED X-RAY FACILITIES BEING CONSIDERED AS PART OF INCREASED AIRPORT SECURITY. TECHNOLOGY DEVELOPMENT ASSOCIATES, INC. (TDA) PROPOSES AN EXPERIMENTAL PROGRAM TO STATISTICALLY EVALUATE DAMAGE THRESHOLDS. X-RAY TRANSPORT ANAL ...

    SBIR Phase I 1994 Department of Transportation
  9. DEMONSTRATING THE PROFITABILITY OF LINKING PRIVATE DEVELOPMENT USING THE HORIZONTAL DEVELOPMENT PROCESS (HOP) TO PROVIDE FREE INCREMENTS OF TRANSIT FOR THE PUBLIC.

    SBC: Cityscope & Mobility Co            Topic: N/A

    PRIVATE INVESTMENTS IN TRANSPORTATION CAN BE PROFITABLE. THE HORIZONTAL DEVELOPMENT PROCESS (HDP), EMPLOYING A SPECIALIZED FORM OF PEOPLE-MOVER AS A HORIZONTAL ELEVATOR (H*E), MAXIMIZES THE DEVELOPMENT POTENTIAL, REDUCES THE RISK OF HIGH COSTS OR LOW INVESTMENT RETURN. AN HDP GUIDE WITH INDEPENDENT FINANCIAL APPRAISALS INCLUDING PROFORMA DATA AND PRELIMINARY UTAG (URBAN TRANSPORTATION ACTION GRANT ...

    SBIR Phase I 1987 Department of Transportation
US Flag An Official Website of the United States Government