You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Coating Existing Concrete Barriers to Reduce Rollover Potential
SBC: NANOSONIC INC. Topic: 121FH1The objective of this DoT SBIR program is to further establish the technical foundation of low friction HybridSil® Slippery Overturn Automobile Protection (SOAP) coatings on concrete barriers for drastic reductions in vehicle rollover potential and significantly increased concrete impact durability thus, enabling the rapid commercial integration of these coatings. To meet this challenge, NanoSoni ...
SBIR Phase II 2013 Department of Transportation -
A Multi-Sensor Hybrid System for Vehicle Classification of Thirteen Classes
SBC: Migma Systems Inc. Topic: 081FH4Image processing methods have been studied and implemented for the vehicle classification over the past decades. The most dominant approach is the use of vehicle dimension, which requires complex processes of sensor calibration as the vehicle dimensions shown in the imagery are heavily dependent on the camera’s field of view. In general, video systems have physical disadvantages related to the ...
SBIR Phase II 2013 Department of Transportation -
Transportation System Performance Measurement Using Existing Loop Infrastructure
SBC: CLR ANALYTICS INC Topic: 102FH2With continuing emphasis on transportation sustainability and fiscal stewardship, utilizing existing loop detector infrastructure to obtain more accurate, reliable and comprehensive traffic system performance measures is desired by many transportation agencies. In Phase I study, we found that the capability of the Inductive Loop Detector (ILD) signature technology to re-identify and classify vehic ...
SBIR Phase II 2013 Department of Transportation -
Augmenting Inductive Loop Vehicle Sensor Data with SPAT and GrID (MAP) via Data Fusion
SBC: Savari Inc. Topic: 111FH2In this proposal, we have proposed a program for twenty months to build on the basic ideas and feasibility developed in Phase I of this SBIR in order to demonstrate the practical use of DSRC technologies with signal controller for adaptive timing with a goal towards commercialization. Specifically, we intend to further develop, build and integrate advanced signal control algorithms that make use o ...
SBIR Phase II 2013 Department of Transportation -
Augmenting Inductive Loop Vehicle Sensor Data with SPAT and GrID (MAP) via Data Fusion
SBC: HARMONIA HOLDINGS GROUP, LLC Topic: 111FH2Our goal is to create a demonstrable software system that we call IntelliFusion, which fuses Connected Vehicle data with data from traditional inductive loop detectors and uses this data to improve traffic control at intersections across the country. Our work will improve the safety of intersections and improve the mobility of traffic through adaptive traffic control which uses data produced by I ...
SBIR Phase II 2013 Department of Transportation -
Portland Cement Concrete Pavement Recycling
SBC: Road Processing Resources Inc. Topic: N/ARPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...
SBIR Phase II 2004 Department of Transportation -
Smartphone Signal Alert Status
SBC: Savari Inc. Topic: 111FH1The primary objective for Phase I was to design and develop a proof of concept system demonstrating the basic functionality and feasibility to deploy technology in the field. During the six-month effort, a detailed Concept of Operations document was prepared that served as a foundation for the design and development of the SmartCross system. The core components of the system: (a) Smartphone applic ...
SBIR Phase II 2013 Department of Transportation -
"A WWW-Based Digital Library System for Managing Aviation Safety Research Information"
SBC: Interconnect Technologies Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: N/ADuring Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...
SBIR Phase II 2004 Department of Transportation -
Communicating Towed unit (Trailer) Vehicle Identification Number(s) (VIN) to the Powered Unit
SBC: Intelligent Automation, Inc. Topic: 121FM1Usually the lifetime of a trailer is much longer than tractors; tractors must work with a variety types and ages of trailers over the course of their use. In many scenarios (e.g., roadside inspection, border crossing, smart parking, connected vehicle initiative, etc.), it is necessary to identify trailer(s)' VIN(s) and know their sequences attached to the powered unit. An automated trailer VIN id ...
SBIR Phase II 2013 Department of Transportation