You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 3841 results
  1. Active Material Technology to Improve Solar Sail Performance for Space Weather Monitoring

    SBC: NEXOLVE HOLDING CO LLC            Topic: 96

    Development of a reflection control and direction device (RCDD) is proposed. This innovative device will progress the state of the art for propulsion of solar sails used to fly space weather monitoring sensors to sub-LaGrange point orbits for earlier warning times of impending destructive space weather events. A reflection control device (RCD) utilizes polymer dispersed liquid crystal (PDLC) mater ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Developing the Drought Risk Overview Product (DROP): Improving Flash Drought Forecasts and Early Warning Using Machine Learning and Extreme Value Theory Techniques

    SBC: CFD RESEARCH CORPORATION            Topic: 91

    Drought is responsible for $327.7B in economic loss since 1980 in the United States and typically precedes, cooccurs, or initiates other hazards like wildfires or prolonged periods of intense heat. The compounding or cascading of these hazards routinely threatens the wellbeing and stability of communities. The economic impact from drought can be especially harsh when the drought begins rapidly in ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  3. XtruJog: Modernization of Joggling of Extruded Aluminum Parts

    SBC: FAIRMOUNT TECHNOLOGIES LLC            Topic: AFX234DCSO2

    In this proposed D2P2 project, we will rapidly develop a second generation XtruJog machine, XJ-2, to be capable of automatically hot joggling parts with the required joggles at the programmed locations. Self-funded proof-of-concept research has shown that

    SBIR Phase II 2023 Department of DefenseAir Force
  4. Space Launch & Operations Common Operating Picture

    SBC: TESSERACT VENTURES LLC            Topic: AFX234DCSO2

    The Tesseract Smart Space Environment is a collaborative workspace designed to create immersive situational awareness and control over highly desperate information streams. This may include incoming feeds from IoT assets, cameras, sensors, enterprise soft

    SBIR Phase II 2023 Department of DefenseAir Force
  5. Orbital Assembly- Beamed Energy Receiver

    SBC: ABOVE: ORBITAL INC.            Topic: AFX234DCSO1

    Orbital Assembly is currently developing a beamed energy receiver for the use in commercial space stations. No technology to receive beamed power currently exists, and this technology will be applicable to US Government spacecraft with little modification

    SBIR Phase II 2023 Department of DefenseAir Force
  6. Miniaturized Fly-Along Sensor Package (MiniFASP)

    SBC: NOU SYSTEMS INC            Topic: AF231D013

    As a national defense priority and part of the strategic deterrence triad, Intercontinental Ballistic Missiles (ICBMs) have a key role in the nation’s defense.  The US Air Force routinely tests ICBMs to insure all aspects of their function. The Air Force

    SBIR Phase II 2023 Department of DefenseAir Force
  7. Reserve, Remotely Activated Battery for Sage 1 Flight Control Unit for Minuteman III ICBM

    SBC: BINERGY SCIENTIFIC, INC.            Topic: AF231D009

    Thermal batteries are single discharge reserve batteries that provide very long shelf life, minimal self-discharge, wide storage temperature range, fast activation under sudden power demand, and also wide range of temperature operating conditions. Such un

    SBIR Phase II 2023 Department of DefenseAir Force
  8. Nuclear Certification Reference Architecture

    SBC: VETS, LLC            Topic: AF231D012

    Attaining nuclear certification of Department of Defense (DoD) systems comes as the result of one of the most complex and comprehensive processes in the U.S. Government. Stakeholders required for nuclear certification extend beyond the DoD and cut across

    SBIR Phase II 2023 Department of DefenseAir Force
  9. Virtual Repository for Rapid 3D Modeling of Aeronautical Technical Data for Model Based Definition Products in AF PLM-Teamcenter

    SBC: GLOBAL PRECISION IMAGING, LLC            Topic: AFX236DPCSO1

    Aircraft Availability (AA) is a chief concern for the Air Force Life Cycle Management Center (AFLCMC).This issue was stressed by Lt. Gen. Shaun Morris, Commander of AFLCMC, in his address at the Robins AFB Requirements Symposium in March 2023. He expresse

    SBIR Phase II 2023 Department of DefenseAir Force
  10. Danti Semantic/NLP Search System for Earth Observation Data

    SBC: Geodex Inc            Topic: AFX236DPCSO1

    Air Force/Space Force users are unable to effectively search across databases using natural language search that a computer can understand, and as a result it can take years to train a new geospatial analyst. This puts multiple branches of the government

    SBIR Phase II 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government