You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    THERE IS A NEED FOR A RAPID, NON-DESTRUCTIVE METHOD TO TEST FOR PROPER STEEL PLACEMENT IN PORTLAND CEMENT PAVEMENTS. ISTHE GOAL OF THIS PROPOSED PROGRAM TO DEMONSTRATE THE FEASIBILITY OF USING SHORT-PULSE, GROUND-PENETRATING RADAR AS A MEANS OF RAPID STEEL LOCATION IN CONCRETE PAVEMENT. A GENERAL BACKGROUND IN GROUND-PENETRATING RADAR THEORY IS PRESENTED. LABORATORY AND FIELD MEASUREMENTS USING A ...

    SBIR Phase II 1990 Department of Transportation
  2. COHESIONLESS SOIL AND SMALL DISCONTINUOUS REINFORCING ELEMENTS IN COMPOSITE ENGINEERING MATERIALS

    SBC: Earthwater Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
US Flag An Official Website of the United States Government