You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    THERE IS A NEED FOR A RAPID, NON-DESTRUCTIVE METHOD TO TEST FOR PROPER STEEL PLACEMENT IN PORTLAND CEMENT PAVEMENTS. ISTHE GOAL OF THIS PROPOSED PROGRAM TO DEMONSTRATE THE FEASIBILITY OF USING SHORT-PULSE, GROUND-PENETRATING RADAR AS A MEANS OF RAPID STEEL LOCATION IN CONCRETE PAVEMENT. A GENERAL BACKGROUND IN GROUND-PENETRATING RADAR THEORY IS PRESENTED. LABORATORY AND FIELD MEASUREMENTS USING A ...

    SBIR Phase II 1990 Department of Transportation
  2. INFLATABLE PADDING FOR HARD SURFACES IN VEHICLE INTERIORS

    SBC: Concept Analysis Corp            Topic: N/A

    OCCUPANT INJURY CAN BE SIGNIFICANTLY REDUCED BY THE INCORPORATION OF PADDING OF HARD SURFACES IN VEHICLE INTERIORS. SEVERAL INTERIOR HARD SURFACES SUCH AS ROOF HEADER, A-PILLAR, AND B-PILLAR ARE DIFFICULT TO PAD DUE TO LIMITED SPACE. WAT IS NEEDED IS AN INFLATABLE PLASTIC BI-LAYER THAT COULD BE ATTACHED TO HARD SURFACES AND GIVE ACCEPTABLE WEAR AND APPEARANCE WHEN UNINFLATED, YET BE INFLATABLE DUR ...

    SBIR Phase I 1990 Department of Transportation
  3. COHESIONLESS SOIL AND SMALL DISCONTINUOUS REINFORCING ELEMENTS IN COMPOSITE ENGINEERING MATERIALS

    SBC: Earthwater Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  4. EFFECT OF LOW TEMPERATURE PROCESSING ON POLYSILICON THIN FILM TRANSISTORS

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  5. REAL-TIME HOLOGRAPHIC STEREOGRAM DISPLAY

    SBC: Kms Fusion Inc            Topic: N/A

    KMSF PROPOSES TO DEVELOP A REAL-TIME DISPLAY CAPABLE OF HOLOGRAPHICALLY PROJECTING A 3-DIMENSIONAL IMAGE. DURING THE PHASE I EFFORT, KMS WILL RESEARCH AND EXAMINE THE LIMITATIONS OF THE STATE-OF-THE-ART, ANALYZE EXISTING ELECTRONIC HOLOGRAPHY SYSTEMS, DESIGN A MATHEMATICAL MODEL OF A PROJECTED HOLOGRAPHIC DISPLAY FOR HOLOGRAPHIC STEREOGRAMS AND DEVELOP AN OPTIMIZED DESIGN FOR A HOLOGRAPHIC AUTO-ST ...

    SBIR Phase I 1990 National Science Foundation
  6. VIEW FACTOR APPLICATIONS IN COMPUTER GRAPHICS

    SBC: Kms Fusion Inc            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED WORK IS TO APPLY RADIATION TRANSPORT METHODS DEVELOPED TO STUDY CONTROLLED FUSION TO SIMULATE THE REFLECTION OF LIGHT IN COMPUTER GRAPHICS. VIEWFACTOR METHODS HAVE RECENTLY BEEN APPLIED TO THE STUDY OF TIME DEPENDENT RADIATION TRANSPORT IN ENCLOSURES. CODES DEVELOPED AT KMS FUSION, INC. (KMS) HAVE THE ABILITY, BELIEVED UNIQUE FOR VIEW FACTOR CODES, OF SOLVING TIME DEP ...

    SBIR Phase I 1990 National Science Foundation
  7. PRODUCTION AND CHARACTERIZATION OF POLYCLONAL ANTIBODIES AGAINST MALIC ENZYME AND POST INITIATION PROTEIN NUMBER 5

    SBC: Neogen Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
US Flag An Official Website of the United States Government