You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
STOCHASTIC MODELING OF ANTISYMMETRIC BUFFET LOADS ON HORIZONTAL STABILIZERS
SBC: AEROTECH ENGINEERING & RESEARCH CORP. Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation -
A VARIABLE RATE REAL-TIME SPEECH AND VIDEO CODER FROM 19.2 KBPS TO 64 KBPS AT 10 FRAMES/SECOND
SBC: Atlanta Signal Processors Inc. Topic: N/AN/A
SBIR Phase I 1993 National Science Foundation -
Improved Lightning Forecast for Kennedy Space Center
SBC: Command Control, Inc. Topic: N/AN/A
SBIR Phase I 1993 National Aeronautics and Space Administration -
INTEGRATED COLOR VISION
SBC: Dickerson Vision Technologies Topic: N/ACOMMERCIAL MACHINE VISION WAS TRODUCED IN THE 1970S. TO THIS POINT, IT HAS NOT BEEM USED WIDELY FOR AUTOMATION IN MANUFACTURING DUE TO PERFORMANCE, COMPLEXITY, AND COST ISSUES. MOST COMMERCIAL VISION SYSTEMS ARE BASED ON VIDEO TECHNOLOGY WITH SEPARATE CAMERAS, FRAME GRABBERS, DIGITIZERS, AND PROCESSORS. RELIANCE ON VIDEO TECHNOLOGY LIMITS PERFORMANCE AND REQUIRES EXPENSIVE, COMPLEX ARCHITECTURES. ...
SBIR Phase I 1993 National Science Foundation -
COHESIONLESS SOIL AND SMALL DISCONTINUOUS REINFORCING ELEMENTS IN COMPOSITE ENGINEERING MATERIALS
SBC: Earthwater Corp. Topic: N/AIDENTIFICATION OF OPPORTUNITY: THE DEVELOPMENT OF A PRACTICABLE COMPOSITE GEOTECHNICAL MATERIAL CONSISTING OF SMALL DISCONTINUOUS REINFORCING ELEMENTS IN A COHESIONLESS SOIL MATRIX WOULD HAVE SEVERAL IMPORTANT APPLICATIONS, INCLUDING: BACKFILL FOR RETAINING SYSTEMS; BASE, SUBBASE, AND SUBGRADE MATERIALS FOR PAVEMENTS; ENGINEERED FILLS; BACKFILL AROUND UTILITIES; BEARING MATERIALS FOR FOUNDATIONS I ...
SBIR Phase II 1993 National Science Foundation -
CLEAN ENERGY FROM MUNICIPAL SOLID WASTE
SBC: EnerTech Environmental, Inc. Topic: N/AN/A
SBIR Phase I 1993 National Science Foundation -
Advanced Microwave Imaging Techniques for Materials Processing and Monitoring
SBC: GEMTECH Microwaves Topic: N/AN/A
SBIR Phase I 1993 National Aeronautics and Space Administration -
A P-VERSION OF THE FINITE ELEMENT ALTERNATING METHOD
SBC: Knowledge Systems Inc. Topic: N/ATHE PROPOSED RESEARCH WILL DEVELOP A P-VERSION OF THE FINITE ELEMENT ALTERNATING METHOD (FEA). THE P-VERSION OF THE FEAM WILL ALLOW FOR THE ACCURATE CALCULATION OF FRACTURE PARAMETERS WHILE MINIMIZING THE MODELING EFFORT REQUIRED OF THE USER. THESE TWO BENEFITS WILL MAKE THE FRACTURE MECHANICS COMPUTATIONS NECESSARY FOR THE PREDICTION OF THE RESIDUAL LIFE OF AIRCRAFT STRUCTURES MORE COST EFFECTIVE ...
SBIR Phase I 1993 Department of Transportation -
MACROMOLECULE/ELECTROHEOLOGICAL MICROWAVE PHASE SHIFTERS
SBC: Millimeter Wave Technology, Topic: N/ACURRENT PHASED ARRAY ANTENNA TECHNOLOGY UTILIZES DISCRETE DIGITAL OR ANALOG FERRITE PHASE SHIFTERS WHICH ARE HIGH COST AND RF POWER LIMITED WHEN IN THE TRANSMIT MODE DUE TO THE FERRITE SATURATION PHENOMENA. THE RESEARCH INVESTIGATES MACROMOLECULE AND ELECTROHEOLOGICAL SUSPENSIONS (ERS) AS AN ELECTRICALLY CONTROLLABLE (ANISOTROPIC) MICROWAVE PHASE SHIFTER WHEN A DC FIELD IS APPLIED. THE RESEARCH IN ...
SBIR Phase I 1993 National Science Foundation -
Risk Manager System for Space Shuttle Ground Processing
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1993 National Aeronautics and Space Administration