You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Eliminating Glare in Space Crew Flight and Habitat Environments

    SBC: Advanced Environmental            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  2. STOCHASTIC MODELING OF ANTISYMMETRIC BUFFET LOADS ON HORIZONTAL STABILIZERS

    SBC: AEROTECH ENGINEERING & RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
  3. A NOVEL POTENTIAL/VISCOUS FLOW COUPLING TECHNIQUE FOR COMPUTING HELICOPTER FLOW FIELDS

    SBC: TARGAZYME, INC.            Topic: N/A

    BECAUSE OF THE COMPLEXITY OF THE HELICOPTER FLOW FIELD, A ZONAL METHOD OF ANALYSIS OF COMPUTATIONAL AERODYNAMICS IS REQUIRED. IN THIS RESEARCH, A NEW PROCEDURE FOR COUPLING POTENTIAL AND VISCOUS FLOW CALCULATION SCHEMES IS PROPOSED. AN OVER-LAPPING, VELOCITY-COUPLING TECHNIQUE IS TO BE DEVELOPED WITH THE UNIQUE FEATURE THAT THE POTENTIAL FLOW SURFACE SINGULARITY STRENGTHS ARE OBTAINED DIRECTLY FRO ...

    SBIR Phase II 1990 National Aeronautics and Space Administration
  4. COUPLING GRID ADAPTION TO AN IMPLICIT NAVIER-STOKES SOLUTIONPROCEDURE

    SBC: Amtec Engineering Inc            Topic: N/A

    A GRID ADAPTION PROCEDURE IS PROPOSED FOR A RECENTLY DEVELOPED CLASS OF NAVIER-STOKES SOLVERS WHICH USE RELAXATION RATHER THAN APPROXIMATE FACTORIZATION TO SOLVE THE LINEAR SYSTEM OF EQUATIONS. THE OBJECTIVE OF THE PROPOSED WORK IS THE IMPLICIT COUPLING OF AN EXISTING TWO-DIMENSIONAL NAVIER-STOKES CODE AND AN EXISTING TWO-DIMENSIONAL GRID ADAPTION CODE. THE GRID ADAPTION USES A SPRING/DAMPER ANALO ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
  5. Hybrid Structured-Unstructured Grid-Implicit Algorithm for Geometrically Complex Flow Fields

    SBC: Amtec Engineering Inc            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  6. A VARIABLE RATE REAL-TIME SPEECH AND VIDEO CODER FROM 19.2 KBPS TO 64 KBPS AT 10 FRAMES/SECOND

    SBC: Atlanta Signal Processors Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 National Science Foundation
  7. EVALUATION OF PVDF FILM AS A PRESSURE SENSOR

    SBC: B&d Instruments And Avionics            Topic: N/A

    THIS INNOVATION PROPOSAL WILL RESEARCH THE FEASIBILITY OF DEVELOPING A HIGHLY ACCURATE, LOW COST POLYMER SENSOR, UTILIZING THE PIEZOELECTRIC PROPERTIES OF PVDF COMBINED WITHA DIAPHRAGM AND/OR OTHER FORCE SENSITIVE STRUCTURE TO PRODUCE A PRESSURE SENSOR. THE POLYMER SENSOR WILL BE EASILY ADAPTED TO COMMERCIAL AND GENERAL AVIATION AIRCRAFT TO ADDRESS SENSORS UTILIZED IN SMART ANGLE OF ATTACK AND ANG ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
  8. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    THERE IS A NEED FOR A RAPID, NON-DESTRUCTIVE METHOD TO TEST FOR PROPER STEEL PLACEMENT IN PORTLAND CEMENT PAVEMENTS. ISTHE GOAL OF THIS PROPOSED PROGRAM TO DEMONSTRATE THE FEASIBILITY OF USING SHORT-PULSE, GROUND-PENETRATING RADAR AS A MEANS OF RAPID STEEL LOCATION IN CONCRETE PAVEMENT. A GENERAL BACKGROUND IN GROUND-PENETRATING RADAR THEORY IS PRESENTED. LABORATORY AND FIELD MEASUREMENTS USING A ...

    SBIR Phase II 1990 Department of Transportation
  9. Improved Lightning Forecast for Kennedy Space Center

    SBC: Command Control, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  10. INTEGRATED COLOR VISION

    SBC: Dickerson Vision Technologies            Topic: N/A

    COMMERCIAL MACHINE VISION WAS TRODUCED IN THE 1970S. TO THIS POINT, IT HAS NOT BEEM USED WIDELY FOR AUTOMATION IN MANUFACTURING DUE TO PERFORMANCE, COMPLEXITY, AND COST ISSUES. MOST COMMERCIAL VISION SYSTEMS ARE BASED ON VIDEO TECHNOLOGY WITH SEPARATE CAMERAS, FRAME GRABBERS, DIGITIZERS, AND PROCESSORS. RELIANCE ON VIDEO TECHNOLOGY LIMITS PERFORMANCE AND REQUIRES EXPENSIVE, COMPLEX ARCHITECTURES. ...

    SBIR Phase I 1993 National Science Foundation
US Flag An Official Website of the United States Government