You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SBIR PHASE I: Combustion Chemical Vapor Deposition Processing of Lanthanum Phosphate and Beta-Alumina Fiber Coatings for Mullite Matrix Composites

    SBC: CCVD, Inc dba MicroCoating Technologies (MCT)            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  2. SBIR Phase I: Development of an Operator Training Simulatorfor Electric Power Distribution Systems

    SBC: Decision Systems Intl            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  3. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Transportation
  4. IN-PLACE AIR PERMEAMETER FOR OPEN-GRADED DRAINAGE LAYERS

    SBC: Geo-systems Engineering Inc.            Topic: N/A

    A RAPID FIELD TEST IS PROPOSED TO EVALUATE THE PERMEABILITY OF OPEN-GRADED ROAD BASES AND OTHER DRAINAGE LAYERS. THE SAME TEST ALSO SHOULD BE ADAPTABLE TO EVALUATE PERMEABILITIES OF OTHER EXPOSED PAVEMENT LAYERS INCLUDING THOSE COMPOSED OF BITUMINOUS OR PORTLAND CEMENT CONCRETES, AS AN INDEX TO PERMEATION AND POSSIBLY TO DETERIORATION. IT IS PROPOSED THAT THE PERMEABILITY BE EVALUATED THROUGH USE ...

    SBIR Phase I 1989 Department of Transportation
  5. ADVANCED DE-ICING FLUIDS FOR GENERAL AVIATION AIRCRAFT

    SBC: Kohlman Aviation Corp            Topic: N/A

    THE PROPOSED PROJECT WILL DETERMINE THE FEASIBILITY OF THE USE OF ADVANCED TYPE II FLUIDS FOR THE DE-ICING/ANTI-ICING OF GENERAL AVIATION (GA) AIRCRAFT WITH TAKEOFF SAFETY SPEEDS (V2) OF GENERALLY LESS THAN 85 KNOTS. TYPE II FLUIDS WILL BE APPLIED TO SEVERAL GA CATEGORY AIRCRAFT. THE ICE PROTECTION CAPABILITY OF THE FLUID WILL BE EVALUATED FOR DIFFERENT FREEZING PRECIPITATION CONDITIONS. THE EFFEC ...

    SBIR Phase I 1989 Department of Transportation
  6. NEW METHOD OF OXIDATION- REDUCTION OF HAZARDOUS ORGANICS

    SBC: American Combustion Inc            Topic: N/A

    AN EVALUATION OF THE FEASIBILITY OF A NEW METHOD OF OXIDATION - REDUCTION OF HAZARDOUS ORGANICS BY THE USE OF A SACRIFICIAL METAL IN A SPONTANEOUS PROCESS TRIGGERED BY CEMENTATION OF A NOBLE METHOD WILL BE PREFORMED. EFFECTS ASSOCIATED WITH MAJOR PROCESS PARAMETERS SUCH AS PH,MIXING, ATMOSPHERE, ETC. ON THE EFFICIENCY AND RATES OF OXIDATION - REDUCTION OF VARIOUS CLASSES OF HAZARDOUS ORGANICS WILL ...

    SBIR Phase I 1988 National Science Foundation
  7. SCHEDULING TECHNOLOGY FOR SEMICONDUCTOR FABRICATION

    SBC: Caps Logistics, Inc.            Topic: N/A

    MINIATURIZATION OF ELECTRONIC COMPONENTS INTO INTEGRATED CIRCUITS (SEMICONDUCTOR DEVICES) HAS DRAMATICALLY AFFECTED OUR LIVES. NO WHERE IS THIS MORE APPARENT THAN THE LARGE DEPENDENCY AMERICAN MANUFACTURING HAS ON SEMICONDUCTOR DESIGN AND FABRICATION. THE PRODUCTION OF AN INTEGRATED CIRCUIT REQUIRES A FOUR STAGE PROCESS: 1) WAFER FABRICATION; 2) WAFER PROBE; 3) ASSEMBLY (PACKAGING); AND 4) FINAL T ...

    SBIR Phase I 1988 National Science Foundation
US Flag An Official Website of the United States Government