You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Broad Spectrum Absorption-Fluorescence Method for Determining Adsorption Capacity of Fly Ash

    SBC: PHOSPHORTECH CORP            Topic: 171FH1

    Interference of unburned and activated carbon in fly ash with air-entraining admixtures (AEA’s) in fresh concrete mixtures is a major concern in the concrete industry. Therefore, a rapid and accurate measurement of adsorption capacity of fly ash is of great interest to this industry. In this project, a new method is suggested, which can qualitatively and quantitatively measure different surfact ...

    SBIR Phase I 2017 Department of Transportation
  2. Genetic /Genomic Technology to Improve Farmed Insects for Sustainable Nutrition, Health and Other Applications

    SBC: ALL THINGS BUGS LLC            Topic: SB163002

    As the human population grows, it is critical to decrease consumption materials from the planet and its ecosphere. The world adds 70 million people annually. The UN expects the population to grow to over 9 billion 2050. Climate change, soil degradation, ...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  3. Persistent Platform in Geosynchronous Earth Orbit

    SBC: SPACEWORKS ENTERPRISES INC            Topic: SB161007

    In the Phase I SBIR, the SpaceWorks team proved the technical feasibility of a modular persistent platform in GEO based on the assembly of individual spacecraft each sized to the DARPA POD form factor. The team also determined that such a platform would ...

    SBIR Phase II 2017 Department of DefenseDefense Advanced Research Projects Agency
  4. DEVELOPMENT OF PLANNING SYSTEMS FOR PROBLEMS SUBJECT TO UNCERTAINTY AND RESOURCE SCARCITY

    SBC: Artificial Intelligence            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  5. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    THERE IS A NEED FOR A RAPID, NON-DESTRUCTIVE METHOD TO TEST FOR PROPER STEEL PLACEMENT IN PORTLAND CEMENT PAVEMENTS. ISTHE GOAL OF THIS PROPOSED PROGRAM TO DEMONSTRATE THE FEASIBILITY OF USING SHORT-PULSE, GROUND-PENETRATING RADAR AS A MEANS OF RAPID STEEL LOCATION IN CONCRETE PAVEMENT. A GENERAL BACKGROUND IN GROUND-PENETRATING RADAR THEORY IS PRESENTED. LABORATORY AND FIELD MEASUREMENTS USING A ...

    SBIR Phase II 1990 Department of Transportation
  6. NEWEST GENERATION SOLID STATE INERTIAL MEASUREMENT UNIT APPLICATION TO TANK AND HOWITZER-FIRED INERTIALLY GUIDED CONVENTIONAL MUNITIONS

    SBC: Brown R G Associates Inc.            Topic: N/A

    FEASIBILITY STUDY FOR APPLICATION OF MICROMECHANICAL GYRO AND ACCELEROMETER TECHNOLOGY OR OTHER SOLID STATE INERTIAL SENSORS FOR INERTIALLY GUIDED CONVENTIONAL MUNITIONS. INERTIAL MEASUREMENT UNITS (IMU'S) ARE CONCEPTUALLY DEFINED FOR USE ON THE MUNITION AND ON THE WEAPON DELIVERY PLATFORM. ESTIMATES OF IMPACT ACCURACY MADE. IMU REQUIREMENTS ARE DEFINED. INNOVATIVE DUAL IMU APPROACH APPLIED TO TAN ...

    SBIR Phase II 1990 Department of DefenseDefense Advanced Research Projects Agency
  7. RAPID PROTOTYPING OF ELECTROMECHANICAL SYSTEMS BY PRINTED INTEGRATED FABRICATION

    SBC: Light Sculpting Inc            Topic: N/A

    THE PROJECT IS AIMED AT DEVELOPING A NEW TECHNOLOGY FOR PRINTED INTEGRATED FABRICATION OF ELECTROMECHANICAL SYSTEMS (INCLUDING MULTI-LAYER ELECTRIC CIRCUT BOARDS AS WELL AS OPTOELECTROMECHANICAL DEVICES SUCH AS AIRCRAFT/VEHICLE INSTRUMENT PANELS) AS A MONOLITHIC OBJECT USING A FAST LOW-COST AUTOMATABLE PROCESS THAT IS HIGHLY EFFICIENT FOR PROTOTYPING. THE PROCESS IS BASED ON SOLIDIFICATION OF LIQU ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  8. MULTICHAIN LORAN-C TIME DIFFERENCE MONITOR RECEIVER

    SBC: LOCUS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
US Flag An Official Website of the United States Government