You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. RECYCLING OF DUST FROM ELECTRIC ARC FURNACES

    SBC: Pei Associates Inc            Topic: N/A

    THE MAJOR SHORTCOMINGS OF THE VARIOUS PROCESSES SUGGESTED BY RECYCLING METALLURGICAL DUST HAVE BEEN THE HIGH CAPITAL COST OF THE EQUIPMENT AND THE NEED FOR LARGE QUANTITIES OF DUST FOR THE PROCESSES TO BE ECONOMICAL. ELECTRIC ARC FURNACE DUST IS NOT AMENABLE TO THESE PROCESSES BECAUSE IT IS GENERATED IN SMALL QUANTITIES AND A LARGE NUMBER OF LOCATIONS, DISTANT FROM INDUSTRIAL CENTERS WHERE REGIONA ...

    SBIR Phase II 1984 Environmental Protection Agency
  2. THE INCREASED RELIANCE OF THE POWER INDUSTRY ON U.

    SBC: Pei Associates Inc            Topic: N/A

    THE INCREASED RELIANCE OF THE POWER INDUSTRY ON U.S. COAL RESERVES IS THREATENED BY AN OVERALL DECLINE IN THE DEMAND OF POWER, THE HIGH COST OF FINANCING NEW PLANTS, MORE STRINGENT REGULATORY REQUIREMENTS, AND INEFFICIENT ENERGY RECOVERY AND POLLUTION CONTROL. CONVENTIONAL AND ESTABLISHED EMERGING COAL-FIRED POWER GENERATION TECHNOLOGIES DO NOT APPEAR TO OFFER THE DESIGN TECHNOLOGY BREAK-THROUGH N ...

    SBIR Phase I 1984 Environmental Protection Agency
US Flag An Official Website of the United States Government