You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Manufacturing Methods for Sulfur Concrete Sewer Pipe

    SBC: Brimstone Pipe Company            Topic: N/A

    This Phase I research is intended to evaluate the feasibility of manufacturing low-cost, acid-resistant sanitary sewer pipe from sulfur concrete. Sulfur is an abundant mineral recovered from coking, natural gas processing, and petroleum refining. Secondary recovery of sulfur, resulting from environmental regulation, produces more material than is needed by U.S. industry. The U.S. Bureau of Mines ...

    SBIR Phase I 1997 Environmental Protection Agency
  2. Laser Diode Array for Multiple Pollutant Monitoring

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    Infrared tunable diode laser spectrometers provide a highly effective means of measuring trace concentrations, with either remote sensing or with advective sampling. It is often desirable to measure more than one trace gas at a time. This is especially true when gas emissions are strongly correlated, such as in combustion emissions where measuring both the CO2 concentration and another minor con ...

    SBIR Phase I 1997 Environmental Protection Agency
  3. Development of a Multianalyte Biosensor Instrument

    SBC: Ergopedia, Inc.            Topic: N/A

    This Phase I project will develop a multianalyte biosensor field screening instrument (MBFI). The MBFI has the potential to reduce the annual cost of environmental analyses in the United States by more than $20 million and to reduce the analysis turnaround time from approximately 19 days to less than 15 minutes. The major barrier to the development of a biosensor instrument for environmental mea ...

    SBIR Phase I 1997 Environmental Protection Agency
  4. Signal Amplification of Nonextractive Immunoassay

    SBC: Fayette Environmental Services, Inc            Topic: N/A

    N/A

    SBIR Phase II 1997 Environmental Protection Agency
  5. Measurement of Biological Contamination of Water

    SBC: Maine Research and Technology Co, Inc            Topic: N/A

    Laser-induced fluorescence (LIF) can sometimes be used as a diagnostic device in biology and medicine. In general, LIF has difficulties in relating the fluorescence spectra to the concentration of the emitters within the tissue, in identifying different species, and in the possibility of destroying the molecules being probed if the wrong excitation wavelength is chosen. Many of the problems asso ...

    SBIR Phase I 1997 Environmental Protection Agency
  6. Environmentally Safe NO/VOC Automotive Coatings/Prevention and Controls of VOCs

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase II 1997 Environmental Protection Agency
  7. Development of a Low Toxicity Treatment for Zebra Mussels

    SBC: Pharmacognetics, Inc.            Topic: N/A

    Zebra mussels cause an estimated $5 billion in economic damages annually. They clog water intake pipes, damage water supplies, threaten native fish and aquatic species, and promote the mobilization of toxic materials into the food chain. Chlorination is presently the most common treatment for zebra mussels. However, chlorine causes many serious environmental risks, thus necessitating the develo ...

    SBIR Phase I 1997 Environmental Protection Agency
US Flag An Official Website of the United States Government