You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Manufacturing Methods for Sulfur Concrete Sewer Pipe
SBC: Brimstone Pipe Company Topic: N/AThis Phase I research is intended to evaluate the feasibility of manufacturing low-cost, acid-resistant sanitary sewer pipe from sulfur concrete. Sulfur is an abundant mineral recovered from coking, natural gas processing, and petroleum refining. Secondary recovery of sulfur, resulting from environmental regulation, produces more material than is needed by U.S. industry. The U.S. Bureau of Mines ...
SBIR Phase I 1997 Environmental Protection Agency -
Unique Selected Area Deposition o Copper Onto Aluminum for Multichip Module Applications
SBC: Brewer Science Incorporated Topic: N/AThe inability to deposit copper directly onto aluminum is a longstanding problem in microelectronic manufacturing. Presently, aluminum must be coated with a barrier layer such as TiN to promote copper adhesion and provide good electrical contact between the two metals. This work will demonstrate a nonaqueous galvanic process for selectively depositing a highly adherent copper coating directly o ...
SBIR Phase I 1997 Department of DefenseAir Force -
Signal Amplification of Nonextractive Immunoassay
SBC: Fayette Environmental Services, Inc Topic: N/AN/A
SBIR Phase II 1997 Environmental Protection Agency -
Portable Auditory Diagnostic System
SBC: Kedly, Inc. Topic: N/AKedley Incorporated proposes to develop a prototype portable auditory diagnostic device capable of implementing 5 major auditory diagnostic tests including pure-tone audiometry, speech audiometry, tympanometry, distortion product otoacoustic emissions, and evoked auditory brainstem potentials. These tests are now implemented with 4 separate, large and combersome devices that often share the same ...
SBIR Phase I 1997 Department of DefenseAir Force -
Intelligent Semantic Integration of Graphics Objects and Text
SBC: VAN HOUTEN TECHNOLOGIES, INC. Topic: N/AThe objective of this research is to significantly reduce the human intervention required to link text and graphics. Many current research efforts have focused on linking text to graphics objects by: (1) developing textual graphics descriptors which can be used to identify graphics objects and (2) developing methods for linking, interpreting, and integrating text to graphics. This effort prop ...
SBIR Phase I 1997 Department of DefenseAir Force -
CORRELATION OF POLYIMIDE RESIN MECHANICAL PROPERTIES WITH POLYMERIC PHYSICAL PROPERTIES
SBC: Brewer Science Incorporated Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
THIN FILM ELECTRET BOUNDARY LAYER TRANSITION DETECTOR
SBC: Crites Enterprises Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
EVALUATION
SBC: Diginetics Topic: N/ATHE FOCUS OF THIS PROJECT WILL BE THE DEVELOPMENT OF A USER-FRIENDLY, INTEGRATED BIOLOGICAL SIGNAL ACQUISITION AND ANALYSIS SYSTEM CAPABLE OF CONCURRENT CONTROL OF STIMULUS PRESENTATION AND THE ACQUISITION OF BIOLOGICAL SIGNALS. BIOLOGICAL/BEHAVIORAL SYSTEMS TO BE MONITORED WILL BE SELECTED ON THE BASIS OF: 1) INTERFERING MINIMALLY WITH ACTIONS REQUIRED OF THE OPERATOR OF COMPLEX EQUIPMENT; 2) BEI ...
SBIR Phase I 1986 Department of DefenseAir Force -
THE PROMULGATION OF AFR-800-23 HAS PROMPTED WIDESPREAD USE OF THE MATE SYSTEM BASELINES THROUGHOUT THE AIR FORCE.
SBC: G2 Associates Topic: N/ATHE PROMULGATION OF AFR-800-23 HAS PROMPTED WIDESPREAD USE OF THE MATE SYSTEM BASELINES THROUGHOUT THE AIR FORCE. THIS WIDESPREAD ACCEPTANCE OF MATE HAS GENERATED MANY NEW REQUIREMENTS, AND WITH THEM HAS COME THE NEED TO REVIEW AND UPGRADE THE MATE ICA STANDARD. THIS EFFORT SEEKS TO RESEARCH THE WAY IN WHICH THIS STANDARD SHOULD BE UPGRADED. IT SURVEYS WEAPON SYSTEMS THAT ARE CANDIDATES FOR MATE A ...
SBIR Phase I 1986 Department of DefenseAir Force -
MAXIMIZING ANAEROBIC SLUDGE SIGESTION RATE BY USING FIXED FILM SYSTEM
SBC: Inc.ubator Technologies Inc. Topic: N/AN/A
SBIR Phase I 1986 Environmental Protection Agency