You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Manufacturing Methods for Sulfur Concrete Sewer Pipe

    SBC: Brimstone Pipe Company            Topic: N/A

    This Phase I research is intended to evaluate the feasibility of manufacturing low-cost, acid-resistant sanitary sewer pipe from sulfur concrete. Sulfur is an abundant mineral recovered from coking, natural gas processing, and petroleum refining. Secondary recovery of sulfur, resulting from environmental regulation, produces more material than is needed by U.S. industry. The U.S. Bureau of Mines ...

    SBIR Phase I 1997 Environmental Protection Agency
  2. Signal Amplification of Nonextractive Immunoassay

    SBC: Fayette Environmental Services, Inc            Topic: N/A

    N/A

    SBIR Phase II 1997 Environmental Protection Agency
  3. Innovative Complexing Agents for recovery of Heavy Metals in Municipal and Industrial Wastewater

    SBC: Technochem Company            Topic: N/A

    N/A

    SBIR Phase II 1997 Environmental Protection Agency
  4. DEVELOPMENT OF A RETROFIT IN SITU THREE POINT AUDIT DEVICE FFOR TESTING OF LINEARITY AND CALIBRATION OF COMMERCIALLY AVAILABLE IN-STACK TRANSMISSOMETERS

    SBC: Eastern Technical Associates            Topic: N/A

    COMMERCIALLY AVAILABLE IN-STACK TRANSMISSMETERS FOR OPACITY MEASUREMENT PRESENTLY ONLYHAVE THE CAPABILITY OF A ONE POINTDYNAMIC UPSCALE CHECK OR NO DYNAMIC UPSCALE CHECK DURING OPERATION. IN ORDER TO PERFORM NECESSARY MULTI-POINT AUDITSOF LINERARITY CHECKS, THE INSTRUMENT MUST BE REMOVED FROM SERVICE OR AT THE LEAST BE MANUALLY FITTED WITH AN EXTERNAL AUDIT DEVICE. THIS REQUIRES ACCESS TO THE INST ...

    SBIR Phase II 1986 Environmental Protection Agency
  5. MAXIMIZING ANAEROBIC SLUDGE SIGESTION RATE BY USING FIXED FILM SYSTEM

    SBC: Inc.ubator Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Environmental Protection Agency
US Flag An Official Website of the United States Government