You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Manufacturing Methods for Sulfur Concrete Sewer Pipe

    SBC: Brimstone Pipe Company            Topic: N/A

    This Phase I research is intended to evaluate the feasibility of manufacturing low-cost, acid-resistant sanitary sewer pipe from sulfur concrete. Sulfur is an abundant mineral recovered from coking, natural gas processing, and petroleum refining. Secondary recovery of sulfur, resulting from environmental regulation, produces more material than is needed by U.S. industry. The U.S. Bureau of Mines ...

    SBIR Phase I 1997 Environmental Protection Agency
  2. Signal Amplification of Nonextractive Immunoassay

    SBC: Fayette Environmental Services, Inc            Topic: N/A

    N/A

    SBIR Phase II 1997 Environmental Protection Agency
  3. MAXIMIZING ANAEROBIC SLUDGE SIGESTION RATE BY USING FIXED FILM SYSTEM

    SBC: Inc.ubator Technologies Inc.            Topic: N/A

    THE SPECIFIC OBJECTIVE OF THIS STUDY IS TO EVALUATE THE TECHNICAL FEASIBILITY OF EMPLOYING A FIXED FILM ANAEROBIC DIGESTER SYSTEM TO ACHIEVE AN ADEQUATE DEGREE OF BIOLOGICAL SLUDGE DIGESTION WITH A RETENTION TIME WHICH IS ONE ORDER OFMAGNITUDE SHORTER THAN THAT OF THE CONVENTIONAL SUSPENDED- GROWTH DIGESTER. IN ORDER TO MAXIMIZE THE BIOLOGICAL REACTION RATE, THE INFLUENT SLUDGE WILL BE TREATED WIT ...

    SBIR Phase II 1987 Environmental Protection Agency
  4. MAXIMIZING ANAEROBIC SLUDGE SIGESTION RATE BY USING FIXED FILM SYSTEM

    SBC: Inc.ubator Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Environmental Protection Agency
US Flag An Official Website of the United States Government