Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. Multi-Spectral Combat ID Beacon

    SBC: Diffraction, Ltd            Topic: SOCOM10008

    For Phase 2, Diffraction proposes to develop a small, lightweight, low profile, battery powered multi-spectral combat ID beacon. The beacon will output enough energy in the mid wave infrared (MWIR) bands to be visible to nearly all US and allied targetin

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  2. Multi-Spectral Combat ID Beacon

    SBC: Diffraction, Ltd            Topic: SOCOM10008

    Diffraction LTD will develop a multi-spectral battery powered combat ID beacon. Key emitter technologies will include vacuum encapsulated photonic crystals in the MWIR and LWIR spectral bands. In Phase 1, a complete optical, electrical, and mechanical design of the beacon will be produced. A model taking into account emitter characteristics, atmospheric transmission, ambient lighting, and vario ...

    SBIR Phase I 2010 Department of DefenseSpecial Operations Command
  3. Micro Combat ID (MID)

    SBC: QuantaSpec Inc.            Topic: SOCOM10008

    QuantaSpec, Inc., proposes to produce a highly efficient, compact, personnel-worn combat ID beacon visible to a large variety of overhead imaging pods. Multiple incidents of fratricide have highlighted the need for improved combat ID and Identify Friend or Foe (IFF) technology. Recent advances in emitter technology have enabled a new class of signaling device to become practical. QuantaSpec, Inc., ...

    SBIR Phase I 2010 Department of DefenseSpecial Operations Command
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government