You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Visual Ontological Language for Technical Standards (VOLTS)

    SBC: Aztera, LLC            Topic: 9010273R

    Current research shows that failures in the standardization process are often the result of a failure of the participants to communicate or organize. To this effect, NIST has developed a tool, NIST Ontological Visualization Interface for Standards (NOVIS), with an environment for visualizing, browsing, and querying standards. Aztera will create a Computer Aided Standards Development (CASD) framewo ...

    SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Commercial Verde

    SBC: Fernandez, Steven            Topic: 851

    Public and commercial application of NOAA developed products such as climate observations, weather products, and datasets are underutilized by public decision makers, infrastructure asset owners, or the public. Communities realize the risk posed by increases in storm intensity, flooding, and heat waves. However, communities lack understandable models targets to stakeholder questions that are affor ...

    SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Portable high precision nitrogen gas analyzer for eddy covariance flux measurements

    SBC: SOUTHWEST SCIENCES INC            Topic: 861X

    Recent theoretical studies of eddy flux correlation have suggested that the commonly used assumption of dry air having no net flux is erroneous and can lead to significant errors in reported observations. Presently, dry air density is calculated indirectly from measured temperature, pressure and relative humidity, all of which contribute to increased uncertainties in the result. If instead the den ...

    SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Biometrics-at-a-distance

    SBC: VAWD APPLIED SCIENCE & TECHNOLOGY CORP            Topic: SB121004

    There is a need to remotely detect, collect, and evaluate physiological signals of interest. Applications and concepts-of-operations (CONOPs) that would benefit from this capability include, but are not limited to: building-clearing, warfighter health monitoring or battle damage assessment and triage, situational awareness and assessment. Existing micro-impulse radar (MIR) and ultra-wideband (U\1\ ...

    SBIR Phase II 2015 Department of DefenseSpecial Operations Command
  5. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  6. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government