You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH

    SBC: Accident Prevention Group            Topic: N/A

    THE PURPOSE OF PHASE I OF THIS RESEARCH PROJECT IS TO CRITICALLY REVIEW THE EXISTING COMPUTERIZED EOP SYSTEMS FOR BOTH PWR AND BWR PLANTS, DEVELOPED BY VARIOUS NATIONAL AND INTERNATIONAL ORGANIZATIONS TO FULLY UNDERSTAND THEIR ADVANTAGES, DISADVANTAGES AND LIMITATIONS IN TERMS OF THEIR IMPACT ON OPERATORS PERFORMANCE AND RELIABILITY AND RECOMMEND ONE SYSTEM OR A COMPOSITE OF SEVERAL SYSTEMS, BEFOR ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  2. REAL-TIME COLLECTION OF OPERATIONAL DATA TO SUPPORT RISK-BASED OPERATION REGULATION AND INSPECTIONS AT NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    COMPUTERIZED DATA COLLECTION DEVICES EXIST AND ARE BEING USED IN VARIOUS APPLICATIONS AT SOME NPPS FOR SYSTEMS AND EQUIPMENT NOT INSTRUMENTED IN THE CONTROL ROOM. HOWEVER, CURRENT APPLICATIONS IN THE NUCLEAR POWER INDUSTRY ARE RATHER SPORADIC AND NOT EXPLOITING THE FULL POTENTIAL OF THE TECHNOLOGY. FOR EXAMPLE, SEVERAL DIFFERENT NPPS USE SUCH SYSTEMS FOR SINGLE- PURPOSES SUCH AS TRENDS IN EQUIPMEN ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  3. AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    A TWO-DIMENSIONAL NUMERICAL MODEL BASED ON A HYBRID FINITE ELEMENT METHOD WITH MESH ADAPTATION IS PROPOSED TO CALCULATE GROUNDWATER FLOW AND POLLUTANT TRANSPORT IN UNSATURATED POROUS MEDIA. THE ALGORITHM IS MODIFIED TO ENHANCE COMPUTATIONAL SPEED AND STORAGE, AND INCORPORATES PETROV-GALERKIN WEIGHTING FOR THE ADVECTION TERMS. NONLINEARITIES ASSOCIATED WITH UNSATURATED SOIL PROPERTIES, ATMOSPHERIC ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  4. DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS

    SBC: Advanced Systems Concepts            Topic: N/A

    THIS RESEARCH WILL EXECUTE AN INDEPTH STUDY OF THE BASIC FEATURES OF EMBEDDED SYSTEM AND PLANT PROCESS SOFTWARE, INCLUDING ITS INTERACTIONS WITH THE HARDWARE SYSTEMS THAT IT IS INTENDED TO CONTROL AND REGULATE. THE PURPOSE OF SUCH A STUDY WILL BE TO IDENTIFY THE PROCEDURES AND ANALYTICAL TECHNIQUES, TO BE INTEGRATED IN AN EMBEDDED SYSTEM SOFTWARE ANALYSIS METHODOLOGY, THAT CAN BE OF GREATEST UTILI ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  5. ADVANCED METHODS FOR MODELING TEAM EFFECTS ON CONTROL-ROOM OPERATOR PERFORMANCE IN REAL-TIME

    SBC: ASCA, INC.            Topic: N/A

    THIS RESEARCH SEEKS THE DEVELOPMENT AND DEMONSTRATION OF A MODEL THAT REPRESENTS THE GROUP DECISION-MAKING PROCESSES TAKING PLACE INSIDE THE CONTROL ROOM OF A NUCLEAR POWER PLANT UNDER BOTH NORMAL AND ABNORMAL OPERATING CONDITIONS. COGNITIVE DECISIONS, TEAM EFFECTS, AND DYNAMIC FEATURES ARE AMONG THE MAJOR ISSUES THAT WILL BE ADDRESSED IN THE PROJECT. THE BASIC TOOL TO BE USED IS THE INFLUENCE DIA ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government