You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Deployment Planning, Monitoring, and Navigation for Uncrewed Systems

    SBC: GEOMETRIC DATA ANALYTICS INC.            Topic: 94

    In Phase I we developed a software capability for predicting the future positions of ocean drifters. We demonstrated the capability to predict drift for objects of varying shapes and train models based on historical observations. In Phase II we will leverage this software to perform high volume experimentation through which we will fully develop trained models using historical data for both passiv ...

    SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  2. NEXT GENERATION OBSERVATION AND MODELING SYSTEMS

    SBC: INNOVIM, LLC            Topic: 9503

    Atmospheric Rivers (AR) transport large volumes of water vapor outside the tropics and, when making landfall, produce large quantities of rain that replenish aquifers, contribute to beneficial increases in snowpack, yet can cause flooding and significant damage to property and lives. Accurate forecasts of precipitation during landfalling ARs are critical because of their large role in water supply ...

    SBIR Phase II 2021 Department of CommerceNational Oceanic and Atmospheric Administration
  3. New METSAT Display Service for Weather-Ready Nation

    SBC: CARR ASTRONAUTICS CORP            Topic: 843WP

    Phase II of the New METSAT Display project will produce a working beta version of the Earth Imaging product customized for NWS/NOAA as outlined in the Phase I proof of concept. This product will ingest imagery from a data source (in this case a web service of NOAA satellite imagery) and display it accurately on a globe of the Earth. Vector data such as roads, cities, towns, counties, states, etc. ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Improving Commercial Fish Meal Free Aquaculture Diets

    SBC: Bell Aquaculture            Topic: 92

    Domestic US aquaculture is moving toward fishmeal replacement in aquafeeds with a variety of alternative protein sources including plant-based, terrestrial and marine proteins. In our Phase I work we showed the feasibility of modifying the protein quality of several alternate protein sources, specifically animal byproduct meals, and its potential significant impacts on marine fish production. Th ...

    SBIR Phase II 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Climate Impact Visualization Tools using 3D City for Community-Based Planning and Outreach

    SBC: Intelligent Automation, Inc.            Topic: 93

    To build a climate-smart and resilient nation, we need to foster a climate-literate public that understands its vulnerabilities to a changing climate and makes informed decisions. A core component of this challenge is to develop simple, intuitive and high-impact visualizations of climate data--data that is and will be made available through the President’s Climate Data Initiative--for education ...

    SBIR Phase II 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Porous Membrane Electrode for Quantitative Detection of Toxins

    SBC: Mercury Science Inc.            Topic: 816N

    In Phase I, a novel porous electrode was designed to demonstrate a rapid, simple assay for the detection of domoic acid in marine samples. During Phase II, methods to manufacture porous electrodes will be improved to enable high volume production of low-cost biosensors that can be connected to a potentiostat. These biosensors will be incorporated into a portable test kit for the quantitation of do ...

    SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  7. INTERGRATING FIBER OPTIC RADIATION DOSIMETER

    SBC: Quantix Corp            Topic: N/A

    THE PROPOSED PROJECT WILL DEMONSTRATE THE FEASIBILITY OF EMPLOYING ELECTRON TRAPPING (ET) MATERIALS WITH FIBER OPTICS FILAMENTS FOR USE AS MICROPROBE RADIATION DOSIMETERS.THE ET MATERIALS TM CAN BE INTERROGATED BY NEAR-INFRARED TO PRODUCE VISIBLE OUTPUT SCALABLE TO RADIATION DOSES AT THE FIBER TIP. PHASE I WILL ASSESS THE PERFORMANCE OF SUCH MATERIALS AS MICROPORBE RADIATION DETECTORS INTEGRATED W ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
  8. ON-LINE PLANT ANALYZER UTILIZATION IN CONTROL ROOM FOR SURVEILLANCE OF PLANT SAFETY

    SBC: Dynatrek Inc.            Topic: N/A

    THE PRINCIPAL SCOPE OF THE PROPOSED RESEARCH IS TO DEVELOP SOFTWARE FOR A BC-CONTROLLER WHOSE PURPOSE IS TO SUPPLY AND CONSTANTLY UPDATE THE BOUNDARY CONDITIONS (BC) TO AN ON-LINE PLANT ANALYZER, ENABLING IT TO FAITHFULLY TRACK A NUMBER OF THE CONTINUOUSLY MEASURED PLANT PARAMETERS. THE BC-CONTROLLER SAMPLES PLANT MEASUREMENTS FROM THE PLANT COMPUTER MEMORY. THE PLANT ANALYZER, IN TURN, PROVIDES D ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government