You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CO2 Scrubber Material

    SBC: SKYHAVEN SYSTEMS, LLC            Topic: SOCOM222003

    The military is interested in new CO2 scrubber materials for diving closed-circuit rebreathers. In particular, it is desired to replace the existing usage of loosely packed soda lime or soda lime cartridges with a new material enabling it to be regenerated for subsequent diving operations. Furthermore, higher CO2 adsorption is needed than the conventional soda lime materials to enable longer dive ...

    SBIR Phase II 2023 Department of DefenseSpecial Operations Command
  2. Visual Augmentation Systems (VAS) Range Finder

    SBC: ENVISION TECHNOLOGY, LLC            Topic: SOCOM234003

    Attollo Engineering proposes to address the need for a quick-draw, pouch-storable laser rangefinder for day and night urban use. This self-contained unit will weigh less than 18 ounces and have a total volume less than 64 cubic inches. The system will provide post-fire target assurance, showing the operator where the laser landed on the target. In Phase I Attollo will survey and evaluate all relev ...

    SBIR Phase I 2023 Department of DefenseSpecial Operations Command
  3. Advanced Automated Inventory Technology Utilizing SOUND

    SBC: THE TONE KNOWS INC            Topic: DLA232005

    The TONE Knows Inc. ("TONE") will develop next-generation warehouse inventory management, verification, location, and reconciliation utilizing our patented "audio QR Code" technology. This technology allows for the continuous monitoring, tracking, and accounting for every single item stored in a DLA DC, external storage areas, in-theater Distribution Centers, or forward storage facilities, util ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  4. Source Development and Qualification Testing of C-5 Duct Assemblies

    SBC: MENTIS SCIENCES INC            Topic: DLA221001

    The DLA has a need to identify competent and qualified domestic suppliers for mission-critical items that are becoming increasingly scarce. To combat the obsolescence issue, Mentis Sciences Inc. (Mentis) proposes a qualification effort for Bleed Air Ducting for the C-5 Galaxy Air Vehicle (C-5). Mentis understands the importance of supporting the C-5 and maintaining a strong supply chain for compon ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  5. Applications of AI to ensemble forecasts of compound extreme weather events in support of operational adaptation of electric utilities

    SBC: CLIMATE FORECAST APPLICATIONS NETWORK, LLC            Topic: 91

    We propose a high-impact innovation for weather forecasting that integrates global ensemble weather forecasts with an AI-driven post-processing model of extreme weather indices. This innovation will provide the basis for skillful probabilistic forecasts of compound extreme weather events at extended lead times. Extreme weather/climate events of relevance to electric utilities focused on in Phase I ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  6. High Energy Density Batteries

    SBC: TDA RESEARCH, INC.            Topic: SOCOM232003

    To increase the energy capacity, reduce the weight, improve the cyclic lifetime, and shorten the recharging time for batteries for use in future handheld radio applications, we need advanced energy storage technologies that perform better than current Li-ion batteries. TDA proposes to develop batteries based on Lithium-ion/Sulfur (Li-S) battery chemistry. To increase the energy density, rate capab ...

    SBIR Phase I 2023 Department of DefenseSpecial Operations Command
  7. High Energy Density Batteries

    SBC: SkyVision Sciences, LLC            Topic: SOCOM232003

    The military is interested in new high density handheld radio batteries to meet evolving radio systems that require additional power. In particular, it is desired to produce a battery that has a capacity greater than 500 W-hr/kg delivering 12 volts and 16 amp-hours in a package weighing less than 0.84 pounds. This battery shall also maintain greater than 70% of its nominal capacity after 300 full ...

    SBIR Phase I 2023 Department of DefenseSpecial Operations Command
  8. Transition and Commercialization of Affordable Hypersonic TPS Manufactured Using a Selective Laser Heating Process

    SBC: MENTIS SCIENCES INC            Topic: DLA23A003

    Mentis Sciences, Inc. (Mentis) is teaming with Battelle to scale and commercialize Battelle’s materials and manufacturing methods for affordable, high performance, thermal protection systems for hypersonic vehicles. The Selective Laser Heating (SLH) process (Figure 1) shows great promise to reduce the cost and lead time associated with carbon-carbon composite structures used as Thermal Protecti ...

    STTR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. NSN 5998-00-338-7373 and NSN 5998-01-374-2558 Reverse Engineering

    SBC: GLOBAL CIRCUIT INNOVATIONS INC            Topic: DLA231001

    There are significant Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues with electronics used in Department of Defense (DoD) systems. Nearly all DoD electronic systems are uniquely designed and manufactured for their specific applications using commercially available microcircuits at the time that they were designed. Integrated Circuits (ICs), or microcircuits, have an averag ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  10. Versatile Magnesium Recovery From Multiple Compositions

    SBC: EOS ENERGETICS, INC.            Topic: DLA231002

    Estes Energetics will demonstrate a versatile two-step process for the extraction and separation of magnesium powder from a variety of ordnance. In the first step, a solvent-free mechanical approach is used to separate the magnesium from binders. Such an approach maximizes the applicability of the method because it doesn’t rely on specific chemical compatibilities between the separation method a ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government