You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: IPM Development Company Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseArmy
  2. Prototype Application of Mobile, Cloud-based, Watson-Like Technologies for TBI/PTSD Clinical Decision Support and Predictive Analytics

    SBC: Lifecom Inc.            Topic: DHP12005

    The goal of this Phase I project is to develop an engineering plan and to create a prototype for a mobile, cloud-based expert system to aid in diagnosis, decision support and predictive analytics to improve clinical outcomes for veterans, soldiers, and their families with traumatic brain injury (TBI) and posttraumatic stress disorder (PTSD). Lifecom, Inc. is a health information technology compan ...

    SBIR Phase I 2013 Department of DefenseDefense Health Agency
  3. Tools for Rapid Automated Development of Expert Models (TRADEM)

    SBC: EDUWORKS CORPORATION            Topic: A12026

    Intelligent tutoring systems (ITS) are complex adaptive learning systems that simulate one-on-one tutoring. Research shows they improve learning and reduce time to mastery. Unfortunately, they are also expensive and time-consuming to produce. Existing IT authoring tools eliminate low level programming but require that domain models, expert models and content be created manually. In Phase I of t ...

    SBIR Phase II 2013 Department of DefenseArmy
  4. Practical Roots of Trust for Mobile Devices

    SBC: GALOIS, INC.            Topic: HSB0132002

    To meet the critical security needs of the Department of Homeland Security and others, we propose two methods for providing a secure root of trust for mobile devices. One method is designed to integrate as easily into existing systems, while the other requires deeper integration but provides correspondingly stronger security. The keys to our work are practicality and integration: practicality to e ...

    SBIR Phase I 2013 Department of Homeland Security
  5. ASP Motion Base for Stabilized Mounts

    SBC: Flex Force Enterprises Inc.            Topic: A12079

    The flexFORCE engineering team has completed assessment of the critical technical factors required for successful ASP deployment (weight, pointing accuracy, control response, actuation power required, failure modes and effects, scalability, and manufacturability). The team has evaluated the ASP operational environment and requirements, developed a preliminary system design, and executed both dyna ...

    SBIR Phase II 2013 Department of DefenseArmy
US Flag An Official Website of the United States Government