You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Miniature Quickscan Receiver

    SBC: AEROSTREAM COMMUNICATIONS CORPORATION            Topic: SOCOM04004

    Develop a miniature, lowcost scanning receiver.

    SBIR Phase I 2004 Department of DefenseSpecial Operations Command
  2. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase II 2004 Department of Transportation
  3. Microwave Data Telemetry for Marine Container Security

    SBC: INFRARED TELEMETRICS, INC            Topic: HSB041005

    IR Telemetrics builds microwave telemetry systems for transmitting sensor data through narrow metallic passages within automobile engines. IRT devices can interface with sensors and transmit their data to a local receiver network through complex passages as small as four centimeters. Research will adapt IRT core technology to enable continuous communication with marine containers. The performance ...

    SBIR Phase I 2004 Department of Homeland Security
  4. Self-Mobile Trailer

    SBC: Micro Analysis & Design Inc            Topic: SOCOM03006

    The combat load for today's individual Special Operations Forces warfighter is 100 pounds or more, which is unacceptably high. Lighter loads will reduce SOF operator fatigue, and increase his ability to move greater distances in a shorter time than is possible today. As a solution to this problem, we propose to manufacture a self-mobile trailer, a robotic "mule" capable of carrying loads up to 1 ...

    SBIR Phase II 2004 Department of DefenseSpecial Operations Command
  5. Miniature Quickscan Receiver

    SBC: OCEANIT LABORATORIES INC            Topic: SOCOM04004

    Special Operation Forces personnel require a rugged, miniature receiver that is capable of monitoring RF energy while deployed on a mission. The RF receiver will give a better picture of the electromagnetic threat environment enabling a heightened situational awareness, yet the device must be small enough that it does not hamper the SOF warfighter during missions requiring stealth and rapid mobil ...

    SBIR Phase I 2004 Department of DefenseSpecial Operations Command
  6. CMOS FET and AlGaN MODFET Receptor Scaffold for Molecular Recognition and Direct Detection

    SBC: Peterson Ridge LLC            Topic: N/A

    This project is designed to test a novel receptor scaffold/sensor combination for the selective and direct measurement of antigens and to compare direct electric detection of antigens against the corresponding antibody based ELISA method. The scaffold concept combines a robust nucleic acid receptor (aptamer) coupled to a low cost CMOS FET and AlGaN MODFET transducer. Aptamers are short nucleic aci ...

    SBIR Phase I 2004 Department of Homeland Security
  7. Adaptation of Advanced Technology for Ordnance Surveillance to a Marine Asset Tag Tracking System

    SBC: PHASE IV ENGINEERING, INC.            Topic: N/A

    In Phase I, Phase IV proposes to develop the overall architecture and design of a prototype RF system for shipping containers that will operate in the marine environment while being loaded stacked aboard ship, on board deck of a ship in a stack, unloaded, and moved and stacked in shipping terminals. Phase IV has developed a state-of-the-art RF system for tracking and monitoring munitions, both at ...

    SBIR Phase I 2004 Department of Homeland Security
  8. Stand-Off Terahertz Imaging and Spectroscopy Detection of Concealed Weapons and Explosives

    SBC: TeraMetrix, LLC            Topic: N/A

    We propose to develop the design for a stand-off active terahertz imaging and spectroscopy system prototype for the detection of concealed threats at ranges up to 50 meters. Terahertz imaging has the potential to reveal concealed explosives; metallic and non-metallic weapons (such as ceramic, plastic or composite guns and knives); flammables; biological agents; chemical weapons and other threats. ...

    SBIR Phase I 2004 Department of Homeland Security
  9. Portland Cement Concrete Pavement Recycling

    SBC: Road Processing Resources Inc.            Topic: N/A

    RPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...

    SBIR Phase II 2004 Department of Transportation
  10. Development of a Family of Modular Light Tactical Wheeled Vehicles (FMLTWV)

    SBC: SABRE ENGINEERING, INC.            Topic: SOCOM03014

    The military requires a new vehicle core concept, one that can be quickly adapted to varying roles and tactical situations. Furthermore, the design must use part communality in order to reduce the impact on logistics. This means that the vehicle will have different models filling diverse roles while sharing a majority of components. Thereby reducing the number of spares required for support. T ...

    SBIR Phase I 2004 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government