You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Small Team Command, Control, Communications and Situational Awareness (C3SA)

    SBC: CEEBUS TECHNOLOGIES, LLC            Topic: SOCOM08001

    In Phase I Ceebus demonstrated the feasibility of an underwater, acoustic, direct-sequence spread-spectrum communication architecture, including actual data transfers and decoded message recovery. All of the communication algorithms were post-processed and communication was performed with a single piezo transducer. Prototype development is the next step in delivering a system that offers real-time ...

    SBIR Phase II 2010 Department of DefenseSpecial Operations Command
  2. Telecommunications Linking System

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: HSB082004

    Cybernet Systems Corporation will provide a system of hardware and software that will provide advanced data mining capability to the DHS analyst. This system is an add-on to existing DHS, not a replacement. It is intended to interface to the existing systems, provide additional capability for the analyst, and be compatible with DHS regulations with respect to data storage and handling. Its key be ...

    SBIR Phase II 2010 Department of Homeland Security
  3. Web-Based Computer Simulation of Radiological Detection Scenario Training (RDST)

    SBC: Crisis Simulations International, LLC            Topic: 0912

    With the range and variety of radiation detectors that exist and the continuing threat of a radiological disaster in the future, the need for training of first responders and personnel in the front lines of interdiction is extraordinary and daunting. It is daunting because of the number of people across the nation that must be trained initially and who must continually maintain their training to b ...

    SBIR Phase II 2010 Department of Homeland Security
  4. Wearable Thermoelectric Generators for First Responders

    SBC: Perpetua Power Source Technologies, Inc.            Topic: HSB092008

    The human body is a near perfect energy generator. Demand for energy harvesting innovation, along with technology advances in thin film thermoelectric generators and highly efficient DC/DC boost circuitry now place wearable thermoelectric power harvesting within reach. The objective of Perpetua`s Phase II proposal is to deliver an energy harvesting system for first responder applications powered b ...

    SBIR Phase II 2010 Department of Homeland Security
  5. High Efficiency, Large-Area, 1550 nm InGaAs Photodiodes

    SBC: VOXTEL, INC.            Topic: N/A

    A back-illuminated planar InGaAs photodiode tested to have 95% quantum effiiency (QE) at 1550 nm, area greater than 1 mm2, low capacitance (125 MHz) will be improved. Although the existing Phase I device exhibited bulk material dark current generation better than commercially available devices, the sidewall-generated dark current was found to dominate the noise equiva ...

    SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology
  6. Self-Mobile Trailer

    SBC: Micro Analysis & Design Inc            Topic: SOCOM03006

    The combat load for today's individual Special Operations Forces warfighter is 100 pounds or more, which is unacceptably high. Lighter loads will reduce SOF operator fatigue, and increase his ability to move greater distances in a shorter time than is possible today. As a solution to this problem, we propose to manufacture a self-mobile trailer, a robotic "mule" capable of carrying loads up to 1 ...

    SBIR Phase II 2004 Department of DefenseSpecial Operations Command
  7. Development of a Family of Modular Light Tactical Wheeled Vehicles (FMLTWV)

    SBC: SABRE ENGINEERING, INC.            Topic: SOCOM03014

    Having met every technical objective laid out in the Phase I Proposal, the Sabre FMLTWV provides tactical variants not otherwise available to SOCOM with its current fleet. Available in both Narrow Vehicle (NV) and Standard Vehicle (SV) sizes, the FMLTWV shares a unique and innovative active suspension system that provides extended mobility via AWD 4-wheel steering allowing the vehicle to turn wit ...

    SBIR Phase II 2004 Department of DefenseSpecial Operations Command
  8. Direct-Digital Phase-&-Amplitude-Noise Measurement-System

    SBC: TIMING SOLUTIONS            Topic: N/A

    The Direct Digital Phase Noise Measurement Phase 1 SBIR demonstrated the feasibility of the technology to make the measurements required by the commercial marketplace. This new approach to phase noise measurements uses fast digital-to-analog converters to digitize the input RF signal and performs all down-conversion and phase detection functions by digital signal processing. It has several signifi ...

    SBIR Phase II 2004 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government