You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Advanced Microgravity Compatible, Integrated Laundry System
SBC: UMPQUA RESEARCH COMPANY Topic: X302An Advanced Microgravity Compatible, Integrated laundry System (AMCILS) is proposed that uses a two phase water / water vapor system to allow good agitation of clothing during the wash & rinse cycle. Drying will be accomplished utilizing microwave energy addition and "jet" air flow to fluff and move clothing in the washing chamber. Operation in a two phase water / water vapor system precludes th ...
SBIR Phase II 2013 National Aeronautics and Space Administration -
Advanced Long-Range Video Capabilities Using Speckle Imaging Techniques
SBC: EM PHOTONICS INC Topic: A402Flight-testing is a crucial component in NASA's mission to research and develop new aeronautical concepts because it allows for verification of simulated and wind-tunnel experiments and exposes previously unforeseen design problems. Video is an invaluable tool for flight-testing, allowing the collection of a wealth of information such as craft position, speed, health, as well as tracking diff ...
SBIR Phase II 2013 National Aeronautics and Space Administration -
ISS Additive Manufacturing Facility for On-Demand Fabrication in Space
SBC: Made In Space, Inc. Topic: O302Made in Space has completed a preliminary design review of the Additive Manufacturing Facility. During the first half of Phase 1, the design went through conceptual development, simulation testing, cost analysis, and comparison testing of which off-the-shelf parts can be used. The deliverables for Phase I include a written report detailing evidence of demonstrated technology (TRL 5) in the laborat ...
SBIR Phase II 2013 National Aeronautics and Space Administration