You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB).

    SBC: Ei International Inc.            Topic: N/A

    ENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB). THE REQUIRED INFORMATION INCLUDES GEOMETRIC AND OPERATING DATA FOR THE PRIMARY SYSTEM SECONDARY SYSTEM, BALANCE OF PLANT, AND THE TRIP AND CONTROL SYSTEMS. ALTHOUGH, EVERY COMMERCIAL REACTOR IN THE U.S. HAS UNIQUE DESIGN FEATURES, MANY SHARE A COMMON BASIS BY WHICH THEY CA ...

    SBIR Phase I 1984 Nuclear Regulatory Commission
  2. NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT

    SBC: Ybarrondo & Associates            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
  3. HYDROGEN GENERATION AND BLANKETING ASSESSMENT FOR SEVERE ACCIDENTS

    SBC: ENGINEERING SCIENCE ANALYSIS CORP            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  4. NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT

    SBC: Ybarrondo & Associates            Topic: N/A

    THE NUCLEAR REGULATORY COMMISSION (NRC) HAS SPONSORED THE DEVELOPMENT OF THE NUCLEAR PLANT DATA BANK (NPDB) SYSTEM AT TECHNOLOGY DEVELOPMENT OF CALIFORNIA (TDC) FOR APPROXIMATELY THE LAST FIVE YEARS. THIS WORK IS ESSENTIALLYCOMPLETE AND IS AN INTEGRAL PART OF THE NUCLEAR PLANT A (NPA). TO MAKE THE NPDB A USEFUL AND PRODUCTIVE SYSTEM, REPRESENTATIVE DESCRIPTIONS OF NUCLEAR POWER PLANTS MUST BE ENTE ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
  5. HYDROGEN GENERATION AND BLANKETING ASSESSMENT FOR SEVERE ACCIDENTS

    SBC: ENGINEERING SCIENCE ANALYSIS CORP            Topic: N/A

    THE ACCIDENT AT TMI DEMONSTRATED THAT LARGE QUANTITIES OF HYDROGEN CAN BE GENERATED AS A RESULT OF ZIRCONIUM-STEAM OXIDATION REACTION, WHICH POSES A HYDROGEN BURN THREAT IN LWR CONTAINMENTS. THE RATES AT WHICH THE CORE HEATS UP AND WHICH HYDROGEN IS GENERATED DEPENDS UPON THE ZIRONIUM-STEAM REACTION RATE, WHICH IN TURN IS INFLUENCED BY LOCAL STEAM SMSTARVATION AND HYDROGEN BLANKETING EFFECTS. THE ...

    SBIR Phase II 1986 Nuclear Regulatory Commission
  6. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  7. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  8. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government