You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
CLORINE-RESISTANT HOLLOW-FIBER REVERSE-OSMOSIS MEMBRANE ELEMENTS
SBC: BEND RESEARCH, INC. Topic: N/ACOMMERCIALLY AVAILABLE REVERSE-OSMOSIS MEMBRANES ARE CHEMICALLY ATTACHED BY CHLORINE. THUS, CHLORINATION CANNOT BE USED TO PREVENT BIOLOGICAL FOULING OF THE MEMBRANE ELEMENTS. WE PROPOSE DEVELOPMENT OF CHLORINE-RESISTANT MEMBRANE ELEMENTS FOR BRACKISH WATER AND SEA WATER DESALINATION. THE MEMBRANES WILL CONSIST OF A THIN POLYAMIDESALT REJECTING BARRIER ON THE INSIDE SURFACE OF POLYSULFONE HOLLOW F ...
SBIR Phase II 1984 Department of DefenseArmy -
ONBOARD WATER GENERATION FOR MILITARY VEHICLES
SBC: BEND RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseArmy -
FEASIBILITY STUDY FOR ERGONOMICS ANALYSIS AND DESIGN OF FUTURE HELICOPTER COCKPIT SYSTEMS
SBC: Bio-dynamics Research & Dvlp Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseArmy -
ENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB).
SBC: Ei International Inc. Topic: N/AENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB). THE REQUIRED INFORMATION INCLUDES GEOMETRIC AND OPERATING DATA FOR THE PRIMARY SYSTEM SECONDARY SYSTEM, BALANCE OF PLANT, AND THE TRIP AND CONTROL SYSTEMS. ALTHOUGH, EVERY COMMERCIAL REACTOR IN THE U.S. HAS UNIQUE DESIGN FEATURES, MANY SHARE A COMMON BASIS BY WHICH THEY CA ...
SBIR Phase I 1984 Nuclear Regulatory Commission -
HEAT EXCHANGE MATRIX
SBC: Elanco Inc. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseArmy -
NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT
SBC: Ybarrondo & Associates Topic: N/AN/A
SBIR Phase I 1984 Nuclear Regulatory Commission