You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Portable Remote Infrared Raman (PREMIR) System for Early Detection of Peroxide Based IED`s
SBC: RL ASSOCIATES, INC. Topic: N/ARL Associates Inc. proposes to conduct research leading to the development of a remote Raman system for the standoff detection of peroxide-based IED`s. While there have been several Raman systems funded by the Gov`t previously for this pupose, the RL Associates Portable Remote Eyesafe Raman (PREMIR)system is eyesafe and based on our patented volume holographic grating technology to replace the nor ...
SBIR Phase I 2006 Department of Homeland Security -
Universal Longwire Antenna Module for Unmanned Aerial Vehicles and Aircraft
SBC: STAR-H CORP. Topic: SOCOM06003Three trailing wire antenna concepts will be evaluated to find the design which best meets the requirements of the solicitation. Operational and design experience with the widely-used dual trailing wire antenna will represent the starting point for this analysis. Concepts for a single trailing wire, which will have wider applicability will also be studied. A third concept, using a more unique ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
High Quantum Efficiency Fast Detectors for Readout of Scintillators for Gamma Ray Detection
SBC: VOXTEL, INC. Topic: HSB062007High quantum efficiency (QE), fast (
SBIR Phase I 2006 Department of Homeland Security -
THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.
SBC: Daniel & Associates Inc. Topic: N/ATHE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS
SBC: O'donnell Consulting Engineers Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission