You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Helmet-Mounted Thermal Sensor for First Responder Burn-Saver Device

    SBC: TDA RESEARCH, INC.            Topic: HSB0131003

    The personal protective equipment (PPE) worn by firefighters (turnout Gear, SCBA, helmet, etc.) protects the wearer against burns and hazardous environments. Unfortunately, they work so well that they decrease the firefighter's situational awareness, in particular their ability to notice rapidly increasing temperatures. Although current thermal sensor technologies (generally built in to the Pers ...

    SBIR Phase I 2013 Department of Homeland Security
  2. GPS JLOC Sensor Suite for Critical Infrastructure

    SBC: THE NAVSYS CORPORATION            Topic: HSB0131004

    Timing and position data from civil GPS receivers have become integral to the operation of many of the Nation's critical infrastructures. Through the Patriot Watch architecture, DHS is coordinating efforts to identify, locate, and attribute domestic GPS interference, maintain a central database for reports of domestic and international interference to civil use of GPS and its augmentations, and n ...

    SBIR Phase I 2013 Department of Homeland Security
  3. Flowing Water Optical Power Meter for Laser Measurements

    SBC: High Precision Devices, Inc.            Topic: N/A

    High Precision Devices, Inc. (HPD) proposes to use the Phase I SBIR as a vehicle to develop and market a commercially viable 25kW flowing water optical power meter (FWOPM) for industrial, research, and government applications. Building upon existing and fundamentally sound NIST design, and without sacrificing quality or accuracy, HPD will reduce costs and increase manufacturability using best prac ...

    SBIR Phase I 2013 Department of CommerceNational Institute of Standards and Technology
  4. Practical Roots of Trust for Mobile Devices

    SBC: GALOIS, INC.            Topic: HSB0132002

    To meet the critical security needs of the Department of Homeland Security and others, we propose two methods for providing a secure root of trust for mobile devices. One method is designed to integrate as easily into existing systems, while the other requires deeper integration but provides correspondingly stronger security. The keys to our work are practicality and integration: practicality to e ...

    SBIR Phase I 2013 Department of Homeland Security
  5. Delivering a Solar Flare Forecast Model that Improves Flare Forecast (Timing and Magnitude) Accuracy by 25%

    SBC: NORTHWEST RESEARCH ASSOCIATES, INC.            Topic: 943W

    Many activities and technological systems prevalent in today’s society – air traffic control and air travel, the power grids, communications, deep-water drilling operations, human spaceflight – are vulnerable to the effects of sudden flares from our Sun. Because the propagation speed for flare emission is the speed of light, it is necessary to forecast these events in order to mitigate thei ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  7. Applications Engineering: Variable Positive Displacement Supercharged Diesel Engine

    SBC: Vairex Corp.            Topic: N/A

    SOCOM needs powerplants that can combine the power density of gasoline fueled engines with the lowered fire hazard and logistical simplicity of Diesel fueled engines. The primary application is an outboard motor with a nominal rating of 55 hp. This engine also has applications for ultralight aircraft, marine and other platforms throughout the military. There are no commercially available produc ...

    SBIR Phase II 1997 Department of DefenseSpecial Operations Command
  8. CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING

    SBC: Atkinson-noland Assoc. Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government