You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: HIGH PERFORMANCE MATERIALS GROUP, LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseSpecial Operations Command
  2. Quick Release Connector

    SBC: SKY SIGHT TECHNOLOGIES, LLC            Topic: HSB0131005

    The proposed SkySight Technologies Quick Release Connector will independently detect an unexpected mechanical load on the power distribution line. The compact and lightweight SkySight Quick Release Connector uses existing methods and hardware to integrate into the infrastructure, and no special tools or skills are required. While the connector can be latched by hand without any special tools, it c ...

    SBIR Phase I 2013 Department of Homeland Security
  3. Practical Roots of Trust for Mobile Devices

    SBC: GALOIS, INC.            Topic: HSB0132002

    To meet the critical security needs of the Department of Homeland Security and others, we propose two methods for providing a secure root of trust for mobile devices. One method is designed to integrate as easily into existing systems, while the other requires deeper integration but provides correspondingly stronger security. The keys to our work are practicality and integration: practicality to e ...

    SBIR Phase I 2013 Department of Homeland Security
  4. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Tactical Active Anti-Fogging Goggle or Spectacle

    SBC: Abom, Inc.            Topic: SOCOM18003

    ABOM has developed a novel active anti-fog technology platform that has solved the problem of eyewear fogging. These fog-free and ballistics-rated polycarbonate lenses provide the individual soldier with sustained distant visual acuity and improved situational awareness. Under this proposed SBIR Phase I project, ABOM will perform evaluation and feasibility studies for four proposed Military Combat ...

    SBIR Phase I 2018 Department of DefenseSpecial Operations Command
  6. Optical Device for Sorting Particles by Size

    SBC: En'urga Inc.            Topic: NA

    This Phase II SBIR project will continue the development of an optical sorter that will be used to estimate drop sizes in sprays. The optical sorter will determine the size of drops in the 0.1 to 10 microns range. Drops in this size range are prevalent in the automobile industry, where the fuel injection pressures have increased tremendously over the past two decades. These newer injectors provide ...

    SBIR Phase II 2018 Department of CommerceNational Institute of Standards and Technology
  7. Advanced Durability Systems for Unmanned Aerial Vehicle Propulsion

    SBC: IBC Materials & Technologies, LLC            Topic: SOCOM163002

    Group 2-3 UAS engines have low mean time between overhauls (MTBOs), often with as little as 200-400 hours before maintenance must be conducted.This leads to significant maintenance cost and logistics tail for deployed operations.Two-stroke piston and rotary engines for Group 2-3 platforms have common maintenance drivers such as carbon fouling, and wear of cylinders, housings and bearings.Phase I r ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government