List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  4. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  5. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC.            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  6. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. AMES+Brain Stimulation: Treatment for Profound Plegia in Stroke

    SBC: AMES TECHNOLOGY, INC.            Topic: NINDS

    DESCRIPTION (provided by applicant): An estimated 30% of chronic stroke patients with motor disabilities of the limbs are plegic in the hand or the foot - that is, they cannot move the hand or foot. While some plegic stroke patients have completely paralyzed muscles, without the ability to activate even minimally the plegic muscles ( profound plegia ), other plegic stroke patients are capable of p ...

    SBIR Phase I 2010 Department of Health and Human Services
  8. An Internet application for SMART Recovery

    SBC: BEHAVIOR THERAPY ASSOCIATES, LLP            Topic: NIAAA

    DESCRIPTION (provided by applicant): The objective of this research project is to develop, evaluate, and disseminate an Internet-based (web) application for SMART Recovery: Overcoming Addictions (OA). OA will be based on the four point cognitive-behavioral program for SMART Recovery (www.smartrecovery.org). The goal of the OA program is to help users learn cognitive and behavioral skills to abstai ...

    SBIR Phase II 2010 Department of Health and Human Services
  9. Probes for Transient Kinase Complexes

    SBC: Icagen, Inc.            Topic: NIGMS

    DESCRIPTION (provided by applicant): Most cellular processes are regulated by reversible protein phosphorylation, which is controlled by protein kinases and phosphatases. Caldera Pharmaceuticals and MedChem Partners propose to develop new probes for characterizing transient protein complexes. MAPK pathways play important roles in cellular differentiation and survival. MAPKs are serine/threonine pr ...

    SBIR Phase I 2010 Department of Health and Human Services
  10. XRpro Technology for the Detection and Evaluation of Carcinogens

    SBC: Icagen, Inc.            Topic: NCI

    DESCRIPTION (provided by applicant): Caldera Pharmaceuticals will develop quantitative biomarker assays for a set of carcinogens. In Phase I, Caldera will demonstrate the feasibility of using its novel XRpro(R) technology to extract, concentrate, quantify, and characterize carcinogens from biological samples. This will also identify protein adduct biomarkers that are involved in critical carcinoge ...

    SBIR Phase I 2010 Department of Health and Human Services

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government