You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MAXIMIZING DATA ACQUISITION AND PROCESSING SYSTEM CAPABILITIES

    SBC: Calculex Inc            Topic: N/A

    A VARIETY OF HARDWRE ENHANCEMENTS HAVE BEEN MADE OVER THE YEARS TO THE HIGH ENERGY LASER DATA ACQUISITION AND PROCESSING SYSTEM (HELDAPS) AT THE WHITE SANDS MISSILE RANGE HIGH ENERGY LASER SYSTEM TEST FACILITY. THE EXISTING HELDAPS SOFTWARE DOES NOT FULLY UTILIZE THE CAPABILITIES OF THE ENHANCED SYSTEM CONFIGURATION. A PHASE I PROJECT IS PROPOSED TO SYSTEMATICALLY ANALYZE THE HELDAPS ROCESSING REQ ...

    SBIR Phase I 1988 Department of DefenseArmy
  2. IMPROVED AUTOMATED ANALYZER FOR SILT DENSITY INDEX

    SBC: Chemetek            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  3. DEVELOPMENT OF APPROXIMATIONS FOR A FAST-METHOD OF MOMENTS TECHNIQUE BASED ON NORMAL MODES

    SBC: Electro Magnetic            Topic: N/A

    A FAST NEW APPROXIMATION FOR THE METHOD OF MOMENTS SOLUTION OF ELECTROMAGNETIC RESPONSE PROBLEMS IS PROPOSED. THE NEW APPROACH IS BASED ON SEPARATION OF THE PROBLEM INTO A GLOBAL RESPONSE SET DEPENDENT ON NORMAL MODES, AND A LOCAL RESPONSE DEPENDENT ON GEOMETRICAL OPTICS. THE EFFORTS OF NEGLECTING THE LOCAL RESPONSE TERM ALONG WITH OTHER APPROXIMATIONS WILL BE INVESTIGATED TO QUALITFY THE RESULTIN ...

    SBIR Phase II 1988 Department of DefenseArmy
  4. SELF-DEVELOPMENT X-RAY FILM

    SBC: Energy Optics, Inc.            Topic: N/A

    THIS PROGRAM IS ORGANIZED TO DEMONSTRATE THE FEASIBILITY OF A NONSILVER X-RAY PROCESS TO ELIMINATE THE NEED FOR SPECIAL CHEMICALS AND A DAYLIGHT DEVELOPING MACHINE FOR ARMY FIELD DENTAL APPLICATION. THIS PROCESS WILL BE COMPATIBLE WITH CURRENT X-RAY EQUIPMENT. THE IMPORTANT OBJECTIVES OF PHASE I ARE TO INVESTIGATE AND DEMONSTRATE THAT AN X-RAY PICTURE USING EXISTING X-RAY EQUIPMENT, NO CHEMICALS P ...

    SBIR Phase II 1988 Department of DefenseArmy
  5. MEASUREMENT OF HARDNESS ON ARMOR PLATE BY A COMBINED ULTRASONIC MAGNETIC PROBE

    SBC: Magnasonics Inc            Topic: N/A

    SINCE THE HARDNESS OF ARMOR PLATE IS ACHIEVED BY CAREFULLY CONTROLLED HEAT TREATMENTS THAT MODIFY BOTH THE CHEMISTRY AND MICROSTRUCTURE OF THE SURFACE LAYER, ANY PROCEDURE USED TO QUICKLY MONITOR THE LEVEL OF HARDNESS MUST SIMULTANEOUSLY MEASURE THE CHEMICAL COMPOSITION, THE MICROSTRUCTURE AS WELL AS THE STATE OF RESIDUAL STRESS IN THE SURFACE AND THEN COMBINE THESE PROPERTIES INTO A UNIQUE PREDIC ...

    SBIR Phase I 1988 Department of DefenseArmy
  6. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  7. MULTICONDUCTOR CABLE PARAMETER MEASUREMENT CONCEPTS

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  8. NEXT GENERATION VIDEO TRACKER TECHNOLOGY

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    VIDEO TRACKING HAS EVOLVED OVER THE PAST FIFTEEN YEARS FROM SIMPLE CONTRAST TRACKERS TO MORE COMPLEX AND "INTELLIGENT" TRACKING SYSTEMS BASED UPON SCENE INTERPRETATION AND OBJECT IDENTIFICATION METHODS. RESEARCH IN THE PAST DECADE IN AUTOMATIC TARGET RECOGNITION AND REALTIME TRACKING METHODS HAS PRODUCED A NEW GENERATION OF ALGORITHMS APPROPRIATE TO THE TRACKING REQUIREMENT. WHILE SOME OF THE ALGO ...

    SBIR Phase II 1988 Department of DefenseArmy
  9. ADVANCED WEAPON STATION AUTOMATION/INTEGRATION

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  10. AN ADVANCED RAPID INITIATION PROPAGATION IGNITOR SYSTEM FOR LOVA PROPELLANTS

    SBC: TPL, INC            Topic: N/A

    RAPID INITIATED PROPAGATION (RIP) IGNITORS PROVIDE MORE UNIFORM FLAME SPREADING THROUGH PROPELLANT BEDS THROUGH CYLINDRICAL WAVE EXPANSION ACCOMPANIED BY REDUCED EXPANSION EFFECTS ON THE PRESSURE PULSE. IMPROVEMENTS IN RIP IGNITOR PERFORMANCE ARE POSSIBLE THROUGH: INCREASES IN PRIMER CHARGE DENSITY, REDUCTION IN IGNITOR FREE VOLUME, BLENDS OF IGNITOR MATERIALS, AND USE OF HIGH EMISSIVITY SOLIDS. T ...

    SBIR Phase I 1988 Department of DefenseArmy
US Flag An Official Website of the United States Government