You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DECOUPLED PENETRATION ANALYSIS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  2. PHASED ARRAY TELESCOPE IMAGE PROCESSING

    SBC: A-TECH CORPORATION            Topic: N/A

    AN ANALYTIC MODEL OF A WIDE FIELD, PHASED ARRAY IMAGING SYSTEM WILL BE DEVELOPED. THE MODEL IS BASED ON A MEASUREMENT SYSTEM CAPABLE OF ERROR MEASUREMENT DIRECTLY WITH RESPECT TO THE FINAL IMAGE PLANE. THE BEAMS FROM INDIVIDUAL SUBAPERTURES WILL BE COMPACTED AND CONFORMALLY MAPPED TO A DEMAGNIFIED PUPIL. WE WILL DEVELOP NONREDUNDANT, CODED APERTURE MASKS TO BE INSERTED AT THIS COMPACT PUPIL WHICH ...

    SBIR Phase I 1990 Department of DefenseAir Force
  3. OBJECT ORIENTED PROGRAMMING IN C++ ON THE CRAY FOR SCIENTIFIC CODES

    SBC: Kachina Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. AMPLIFYING NERVE AGENT DETECTOR

    SBC: Resource Technologies Group            Topic: N/A

    DEVELOPMENT OF AN AMPLIFYING CHEMICAL AGENT DETECTOR, INCORPORATING A MODULAR APPROACH TO SENSING OF NERVE AGENTS AND OTHER CHEMICALS OF MILITARY INTEREST, IS PROPOSED. THE THREE MODULES: (1) A DYNAMIC TRIGGER WHICH RESPONDS TO THE CHEMICAL AGENT OF INTEREST; (2) A BIOAMPLIFIER WHICH CONTAINS THE CENTRAL SWITCH AND WHICH PROVIDES AN INITIAL AMPLIFICATION STAGE; AND (3) AN ELECTROCHEMICAL TRANSDUCE ...

    SBIR Phase II 1990 Department of DefenseAir Force
  6. ION BEAM PROCESSING ZNSE

    SBC: Sandia Systems, Inc.            Topic: N/A

    ION BEAMS WILL BE APPLIED IN SEVERAL ASPECTS OF PROCESSING ZNSE OPTICAL COMPONENTS. FIRST THE MATERIAL WILL BE MILLED, AND THEN IT WILL BE COATED USING ION ASSISTED DEPOSITION TECHNIQUES. REDUCED SCATTER FROM THE SUBSTRATE AND IMPROVE OPTICAL AND MECHANICAL PROPERTIES OF THE FILM ARE ANTICIPATED.

    SBIR Phase I 1990 Department of DefenseAir Force
  7. NEW CONCEPTS AND INNOVATIONS FOR LOGISTICS SUPPORT (LOGISTICS SUPPORT PLANNING FOR HYPERSONIC VEHICLES)

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    THIS EFFORT WOULD SCOPE THE LOGISTICS PLANNING EFFORTS REQUIRED FOR THE AIR FORCE TO SUPPORT AN ENTIRELY NEW CLASS OF HYPERSONIC VEHICLES,EFFORTS FROM BASE PLANNING TO OPERATIONAL MAINTENANCE SUPPORT. A MATRIX OF PROBABLE WORLD SETTINGS AND MISSION SCENARIOS WOULD SERVE AS A STARTING POINT TO IDENTIFY FIRST-ORDER LFIGHT SYSTEM MISSION REQUIREMENTS, SYSTEM REQUIREMENTS AND ASSOCIATED GROUND SUPPORT ...

    SBIR Phase II 1990 Department of DefenseAir Force
  8. MOBILE AUTOMATED HIGH POWER MICROWAVE DIAGNOSTIC SYSTEM

    SBC: VOSS SCIENTIFIC LLC            Topic: N/A

    THE ADVENT OF MULTI-HZ REP-RATED HPM SOURCES FOR EFFECTS TESTING PLACES SEVERE DEMANDS ON HPM DIAGNOSTIC SYSTEMS, ESPECIALLY IN FIELD USE. INCREASED EMPHASIS ON HIGH SHOT RATES AND THE DIFFICULTY OF QUICKLY SETTING UP AND DEBUGGING THE NECESSARY DIAGNOSTIC INSTRUMENTATION RESULTS IN FIELD EXPERIMENTS THAT OFTEN RECORD ONLY THE MOST BASIC DIAGNOSTIC INFORMATION, SUCH AS POWER DENSITY ENVELOPE AND F ...

    SBIR Phase II 1990 Department of DefenseAir Force
  9. PC-BASED SYSTEM FOR THE RAPID DETERMINATION OF HPM TESTING FIDELITY IN ANECHOIC CHAMBER ENVIRONMENTS

    SBC: VOSS SCIENTIFIC LLC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
US Flag An Official Website of the United States Government