You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. ACTIVATED METAL DECOY FOR LOW IR SIGNATURE AIRCRAFT

    SBC: Alloy Surfaces Company, Inc.            Topic: N/A

    ACTIVATED STEEL FOIL FABRICATED INTO ELEMENTS TO BE PACKAGED AS EXPENDABLE DECOYS HAS SHOWN GOOD PERFORMANCE IN LOW IR SIGNATURE APPLICATIONS. THE PRESENT BATCH PRODUCTION PROCESS FOR THESE FOILS ENTAILS, IN PART, TWENTY HOURS OF FURNACE TREATMENT. A COMBINATION OF NINE SEPARATE OPERATIONS, LOW PRODUCTION RATES AND HIGH LABOR COSTS YIELDS A UNIT MANUFACTURING COST OF MORE THAN $250.00. WE PROPOSE ...

    SBIR Phase I 1990 Department of DefenseNavy
  2. HIGH-SPEED LAUNCHER FOR FRAGMENT SIMULATOR

    SBC: Applied Research Associates, Inc.            Topic: N/A

    AN ECONOMICAL FRAGMENT LAUNCH SYSTEM IS NEEDED TO DUPLICATE WARHEAD FRAGMENT/AIR TARGET ENCOUNTER CONDITIONS ASSOCIATED WITH MODERN AIR TO AIR COMBAT. THE OBJECTIVE OF THIS EFFORT IS TO PROVIDE A DETAILED CONCEPTUAL DESIGN, INCLUDING BUILDING AND OPERATING COST ESTIMATES, FOR A LAUNCH SYSTEM CAPABLE OF PROJECTING METALLIC, PARALLELEPIPED FRAGMENTS WITH WEIGHTS IN THE RANGE OF 30-250 GRAINS (1.9-16 ...

    SBIR Phase I 1990 Department of DefenseNavy
  3. OPERATIONAL SUPPORT AIRCRAFT MANAGEMENT PLANNING SYSTEM

    SBC: Blythe-nelson            Topic: N/A

    THIS EFFORT IS TO DEVELOP THE REQUIREMENTS AND THE SUBSEQUENT DESIGN AND IMPLEMENTATION OF A PC BASED ANALYTICAL SYSTEM FOR PPBS JUSTIFICATION; PEACE TIME AND WAR TIME OPERATIONAL PLANNING FOR THE OPTIMIZATION OF LIMITED OPERATIONAL SUPPORT AIRCRAFT ASSETS. PHASE I WILL CONSIST OF 1. IDENTIFYING RELEVANT DATA ELEMENTS WHICH INCLUDE AIRCRAFT COST, PERFORMANCE CAPABILITY AND CRITICAL DEMAND MODEL CO ...

    SBIR Phase I 1990 Department of DefenseNavy
  4. COMPRESSIBLE FLUID STRUT FOR WHEELED VEHICLES

    SBC: Davis Technologies International, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseNavy
  5. RADIATION HARDENED ROBOT POSITIONER FOR TEST SAMPLES IN PROTON EXPERIMENTS

    SBC: Design Engineering Inc            Topic: N/A

    A ROBOTIC POSITIONER WILL BE DEVELOPED FOR HANDLING AND CHANGING DEVICES TO BE TESTED (DUTS) IN HAZARDOUS RADIATION ENVIRONMENTS SUCH AS THAT FOUND INSIDE THE TEST CELL OF THE BROOKHAVEN NATION LABORATORY PROTON ACCELERATOR. PRESENTLY, PERSONNEL SAFETY INDICATES A LONG "COOLING" TIME BEFORE TEST FIXTURES CAN BE ACCESSED. THIS RESULTS IN LOWERED FACILITY USEFULNESS, INCREASED REAL FACILITY COSTS AN ...

    SBIR Phase I 1990 Department of DefenseNavy
  6. A NEW METHOD FOR PRODUCING PENTAFLUOROTHIO (SF?5:) SUBSTITUTED FUNCTIONAL FLUOROCARBONS

    SBC: Exfluor Research Corporation            Topic: N/A

    THE GOAL OF THIS RESEARCH PROGRAM IS TO DEVELOP A NEW AND CHEAPER METHOD FOR PRODUCING PENTAFLUOROTHIO (SF5) SUBSTITUTED FUNCTIONAL FLUOROCARBONS. THESE MATERIALS HAVE POTENTIAL AS BUILDING BLOCKS FOR ENERGETIC MATERIALS. THEY WILL BE PRODUCED BY THE CONTROLLED REACTION OF SULFUR SUBSTITUTED HYDROCARBONS WITH ELEMENTAL FLUORINE.

    SBIR Phase I 1990 Department of DefenseNavy
  7. MICROWAVE-ACOUSTIC RESONATORS AND FILTERS FOR MMIC MODULES

    SBC: Hartmann Research Inc.            Topic: N/A

    THE TRI-SERVICE MMIC PROGRAM HAS ACHIEVED GOOD SUCCESS IN DEVELOPING MOST OF THE KEY ELEMENTS WHICH ARE NEEDED FOR MONOLITHIC MICROWAVE CIRCUITS. FOR EXAMPLE, AMPLIFIERS, MIXERS, FREQUENCY MULTIPLIERS, FREQUENCY DIVIDERS, MODULATORS, AND DEMODULATORS HAVE ALL BEEN SUCCESSFULLY DEMONSTRATED. HOWEVER, TWO KEY FUNCTIONS HAVE BEEN MISSING, NAMELY FREQUENCY FILTERS AND FREQUENCY SETTING ELEMENTS (FOR O ...

    SBIR Phase I 1990 Department of DefenseNavy
  8. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. SHOCK HARDENED ON-BOARD DATA ACQUISITION SYSTEM

    SBC: KTECH CORP.            Topic: N/A

    THE OBJECTIVE OF THIS PROGRAM IS TO DEVELOP A COMPACT, RUGGED, TWELVE-CHANNEL (MINIMUM) DIGITAL DATA ACQUISITION SYSTEM CAPABLE OF MEASURING AND RECORDING SHOCK EXPERIENCES ASSOCIATED WITH WEAPON DELIVERY AND USE. THE SYSTEM MAY BE MODULAR, BUT EACH MODULE MUST CONTAIN FOUR DATA CHANNELS AND BE NO LONGER THAN 2.5 INCHES MAXIMUM DIMENSION. MECHANICAL DESIGN OF THE SYSTEM MUST BE SUCH THAT IT WILL O ...

    SBIR Phase II 1990 Department of DefenseNavy
  10. MEASUREMENT OF EXPLOSIVE OUTPUTS ELECTRONICALLY

    SBC: KTECH CORP.            Topic: N/A

    NO METHOD CURRENTLY EXISTS TO DIRECTLY RELATE DEVICE OUTPUT TO THE KNOWN INPUT NECESSARY FOR THE RELIABLE INITIATION OF THE NEXT DEVICE IN AN EXPLOSIVE TRAIN. THE OBJECT OF THIS EFFORT IS TO DEVELOP A TECHNIQUE TO PROVIDE AN ELECTRONIC SYSTEM TO MEASURE THE OUTPUTS OF EXPLOSIVE DEVICES. THE PHASE I EFFORT WILL DEVELOP A TECHNIQUE TO ACCOMPLISH THIS OBJECTIVE. WE PROPOSE TO UTILIZE NEW PIEZO FILM T ...

    SBIR Phase I 1990 Department of DefenseNavy
US Flag An Official Website of the United States Government