You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACTIVATED METAL DECOY FOR LOW IR SIGNATURE AIRCRAFT

    SBC: Alloy Surfaces Company, Inc.            Topic: N/A

    ACTIVATED STEEL FOIL FABRICATED INTO ELEMENTS TO BE PACKAGED AS EXPENDABLE DECOYS HAS SHOWN GOOD PERFORMANCE IN LOW IR SIGNATURE APPLICATIONS. THE PRESENT BATCH PRODUCTION PROCESS FOR THESE FOILS ENTAILS, IN PART, TWENTY HOURS OF FURNACE TREATMENT. A COMBINATION OF NINE SEPARATE OPERATIONS, LOW PRODUCTION RATES AND HIGH LABOR COSTS YIELDS A UNIT MANUFACTURING COST OF MORE THAN $250.00. WE PROPOSE ...

    SBIR Phase I 1990 Department of DefenseNavy
  2. HIGH-SPEED LAUNCHER FOR FRAGMENT SIMULATOR

    SBC: Applied Research Associates, Inc.            Topic: N/A

    AN ECONOMICAL FRAGMENT LAUNCH SYSTEM IS NEEDED TO DUPLICATE WARHEAD FRAGMENT/AIR TARGET ENCOUNTER CONDITIONS ASSOCIATED WITH MODERN AIR TO AIR COMBAT. THE OBJECTIVE OF THIS EFFORT IS TO PROVIDE A DETAILED CONCEPTUAL DESIGN, INCLUDING BUILDING AND OPERATING COST ESTIMATES, FOR A LAUNCH SYSTEM CAPABLE OF PROJECTING METALLIC, PARALLELEPIPED FRAGMENTS WITH WEIGHTS IN THE RANGE OF 30-250 GRAINS (1.9-16 ...

    SBIR Phase I 1990 Department of DefenseNavy
  3. MEMBRANE-BASED PROCESS FOR THE REMOVAL OF TOXIC AMMONIUM ION PRODUCED DURING MAMMALIAN-CELL CULTURE

    SBC: BEND RESEARCH, INC.            Topic: N/A

    MAMMALIAN CELLS GROWN IN CULTURE EXCRETE AMMONIUM ION THAT ACCUMULATES IN QUANTITIES THAT MAY LIMIT CELL GROWTH AND REDUCE PRODUCT SYNTHESIS. THE USUAL TACTIC FOR LIMITING THE ACCUMULATION OF AMMONIA IS TO REPLACE THE "SPENT" MEDIUMWITH FRESH MEDIUM. SINCE MEDIUM REPLACEMENT INCREASES THE USE OF EXPENSIVE MEDIUM COMPONENTS, AMMONIUM ACCUMULATION LOWERS CELL AND PRODUCT YIELD ON MEDIUM AND INCREASE ...

    SBIR Phase II 1990 National Science Foundation
  4. MEMBRANE-BASED PROCESS FOR SYNTHESIS OF CHIRAL PYRETHROID INSECTICIDES

    SBC: BEND RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  5. OPERATIONAL SUPPORT AIRCRAFT MANAGEMENT PLANNING SYSTEM

    SBC: Blythe-nelson            Topic: N/A

    THIS EFFORT IS TO DEVELOP THE REQUIREMENTS AND THE SUBSEQUENT DESIGN AND IMPLEMENTATION OF A PC BASED ANALYTICAL SYSTEM FOR PPBS JUSTIFICATION; PEACE TIME AND WAR TIME OPERATIONAL PLANNING FOR THE OPTIMIZATION OF LIMITED OPERATIONAL SUPPORT AIRCRAFT ASSETS. PHASE I WILL CONSIST OF 1. IDENTIFYING RELEVANT DATA ELEMENTS WHICH INCLUDE AIRCRAFT COST, PERFORMANCE CAPABILITY AND CRITICAL DEMAND MODEL CO ...

    SBIR Phase I 1990 Department of DefenseNavy
  6. COMPRESSIBLE FLUID STRUT FOR WHEELED VEHICLES

    SBC: Davis Technologies International, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseNavy
  7. RADIATION HARDENED ROBOT POSITIONER FOR TEST SAMPLES IN PROTON EXPERIMENTS

    SBC: Design Engineering Inc            Topic: N/A

    A ROBOTIC POSITIONER WILL BE DEVELOPED FOR HANDLING AND CHANGING DEVICES TO BE TESTED (DUTS) IN HAZARDOUS RADIATION ENVIRONMENTS SUCH AS THAT FOUND INSIDE THE TEST CELL OF THE BROOKHAVEN NATION LABORATORY PROTON ACCELERATOR. PRESENTLY, PERSONNEL SAFETY INDICATES A LONG "COOLING" TIME BEFORE TEST FIXTURES CAN BE ACCESSED. THIS RESULTS IN LOWERED FACILITY USEFULNESS, INCREASED REAL FACILITY COSTS AN ...

    SBIR Phase I 1990 Department of DefenseNavy
  8. A NEW METHOD FOR PRODUCING PENTAFLUOROTHIO (SF?5:) SUBSTITUTED FUNCTIONAL FLUOROCARBONS

    SBC: Exfluor Research Corporation            Topic: N/A

    THE GOAL OF THIS RESEARCH PROGRAM IS TO DEVELOP A NEW AND CHEAPER METHOD FOR PRODUCING PENTAFLUOROTHIO (SF5) SUBSTITUTED FUNCTIONAL FLUOROCARBONS. THESE MATERIALS HAVE POTENTIAL AS BUILDING BLOCKS FOR ENERGETIC MATERIALS. THEY WILL BE PRODUCED BY THE CONTROLLED REACTION OF SULFUR SUBSTITUTED HYDROCARBONS WITH ELEMENTAL FLUORINE.

    SBIR Phase I 1990 Department of DefenseNavy
  9. MICROWAVE-ACOUSTIC RESONATORS AND FILTERS FOR MMIC MODULES

    SBC: Hartmann Research Inc.            Topic: N/A

    THE TRI-SERVICE MMIC PROGRAM HAS ACHIEVED GOOD SUCCESS IN DEVELOPING MOST OF THE KEY ELEMENTS WHICH ARE NEEDED FOR MONOLITHIC MICROWAVE CIRCUITS. FOR EXAMPLE, AMPLIFIERS, MIXERS, FREQUENCY MULTIPLIERS, FREQUENCY DIVIDERS, MODULATORS, AND DEMODULATORS HAVE ALL BEEN SUCCESSFULLY DEMONSTRATED. HOWEVER, TWO KEY FUNCTIONS HAVE BEEN MISSING, NAMELY FREQUENCY FILTERS AND FREQUENCY SETTING ELEMENTS (FOR O ...

    SBIR Phase I 1990 Department of DefenseNavy
  10. HIGH-RESOLUTION PREPARATIVE LIQUID CHROMATOGRAPHY

    SBC: Ionics International, Inc.            Topic: N/A

    WE PROPOSE TO DESIGN, EVALUATE, AND CONSTRUCT A NEW TYPE OF CHROMATOGRAPHIC SYSTEM CAPABLE OF SEPARATING GRAM QUANTITIESOF PEPTIDE HORMONE AND OTHER SUBSTANCES WITH HIGH RESOLUTION. THE HEART OF THE SYSTEM WILL BE AN EXTRUDED MULTI-CHANNEL CERAMIC BLOCK. SUCH BLOCKS ARE COMMERCIALLY AVAILABLE WITH SEVERAL THOUSAND PARALLEL CHANNELS OF IDENTICAL DIMENSION. THIS IS EQUIVALENT TO USING THOUSANDS OF I ...

    SBIR Phase I 1990 National Science Foundation
US Flag An Official Website of the United States Government