You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
High Speed Combatant Craft Automated Ride Control
SBC: NAIAD DYNAMICS US INC Topic: SOCOM10005The development of an automated ride control system for high speed combatant craft is critical to reducing the motions that cause injury to crew and damage to craft and equipment. Ancillary benefits include reduced fuel consumption for improved range of operation and the reduction of wake signature. The objective of this research project is to continue the successful development of ride control ...
SBIR Phase I 2010 Department of DefenseSpecial Operations Command -
High Efficiency, Large-Area, 1550 nm InGaAs Photodiodes
SBC: VOXTEL, INC. Topic: N/AA back-illuminated planar InGaAs photodiode tested to have 95% quantum effiiency (QE) at 1550 nm, area greater than 1 mm2, low capacitance (125 MHz) will be improved. Although the existing Phase I device exhibited bulk material dark current generation better than commercially available devices, the sidewall-generated dark current was found to dominate the noise equiva ...
SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission