You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Improved Microcalorimeter Detectors for X-ray Chemical Shift Mapping

    SBC: STAR CRYOELECTRONICS, LLC            Topic: 9020868TT

    X-ray fluorescence spectroscopy is a widely used and extremely sensitive analytical technique for qualitative and quantitative chemical analysis. Superconducting Transition Edge Sensor (TES) microcalorimeter detectors have now been developed that achieve an energy resolution of 2 eV for 1.5 keV X-rays, which is sufficient to enable the measurement of the small shift of the X-ray line position that ...

    SBIR Phase II 2013 Department of CommerceNational Institute of Standards and Technology
  2. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Development of a Long Term pH and pCO2 Lagrangian Drifter

    SBC: SUNBURST SENSORS, LLC            Topic: 831C

    Quantifying oceanic CO2 uptake and ocean acidification and understanding their impact on global climate and ocean ecology are key goals of NOAA’s climate change research programs. NOAA’s request for Development of a long-term Lagrangian pH and pCO2 drifter (SBIR Subtopic 8.3.1C) aims to address these goals by developing technology that measures both pCO2 and pH that can be widely deployed in t ...

    SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Deep Submergence Rated Flexible Hoses and Piping System Connectors

    SBC: ATKINS & PEARCE, INC.            Topic: SOCOM08002

    There are many commercially available flexible hoses for use in non-rigid coupling of hydraulic, air, and other piping systems. However, these systems are currently not designed for operating under severe hydrostatic and dynamic pressures experienced by Deep Submergence Systems in their extreme operating environments. The pipes that connect the DDS to the sub are exposed to the water and experien ...

    SBIR Phase II 2010 Department of DefenseSpecial Operations Command
  5. High Efficiency, Large-Area, 1550 nm InGaAs Photodiodes

    SBC: VOXTEL, INC.            Topic: N/A

    A back-illuminated planar InGaAs photodiode tested to have 95% quantum effiiency (QE) at 1550 nm, area greater than 1 mm2, low capacitance (125 MHz) will be improved. Although the existing Phase I device exhibited bulk material dark current generation better than commercially available devices, the sidewall-generated dark current was found to dominate the noise equiva ...

    SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology
  6. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government