You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Short-Range Ultra-Low-Cost Anti-Submarine Sensors
SBC: BROWN COMPUTER CO. Topic: N/ACurrently available equipment for detecting submarines shows poor performance in littoral waters. We propose to deploy a population of inexpensive devices that will augment the capabilities of the currently available equipment to achieve the goal ofdetecting submarines in littoral waters. The U.S. military will achieve the capability of detecting submarines in littoral waters.
SBIR Phase I 2003 Department of DefenseDefense Advanced Research Projects Agency -
HELIKITE ELEVATED PLATFORM- TEST RELAY
SBC: CAROLINA UNMANNED VEHICLES INCORPORATED Topic: N/AThe Helikite Elevated Platform ? Test Relay (HEP-TR) consists of a communications relay payload suspended from a new type of small tethered blimp, called a Helikite, and a Carrier that stores the Helikite and the winch, sensors and helium tanks. TheHEP-TR blimp can be flown at several thousand feet altitude for low cost, long term test communications relay coverage of large areas. It is highly m ...
SBIR Phase I 2003 Department of DefenseAir Force -
Bayesian Variable Resolution Modeling for Autonomous Satellite Cluster Data Fusion
SBC: CLEVERSET, INC. Topic: N/AThe micro-satellite cluster is a revolutionary technology with potential to transform the way we view and deploy space-based applications. Tightly-coupled, highly autonomous satellite clusters promise enhanced mission capabilities and marked reductions inoperational costs. However, ground-based data-processing and control present obstacles to the full realization of this technology.CleverSet prop ...
SBIR Phase I 2003 Department of DefenseAir Force -
WDM and TDM Fiber Architectures for Second Generation Fly-By-Light Systems
SBC: DIGITAL OPTICS CORP. Topic: N/AThis SBIR Phase I project builds upon Digital Optics Corporation's experience in the design, fabrication, and integration of micro-optics with lasers, detectors, and fibers to provide an innovative multiplexing approach for fly-by-light (FBL), fiber-basedcontrol of airborne actuator systems. This work will be performed in partnership with Optical Crosslinks and HR Textron.The proposed method uses ...
SBIR Phase I 2003 Department of DefenseAir Force -
Integrative Platform for Cognative Workload Assessment
SBC: Electrical Geodesics, Inc. Topic: N/AIn modern military operating environments, military personnel are faced with the challenge of accomplishing more with less human resources. To meet this challenge, each personnel must be able to function optimally. In other words, each operator'scognitive resources must be maximized and delegation of tasks by supervisors to each operator must be based upon knowledge of the soldier's remaining co ...
SBIR Phase I 2003 Department of DefenseDefense Advanced Research Projects Agency -
Head Access Laminar Optoelectric Neuroimaging System
SBC: Electrical Geodesics, Inc. Topic: N/AThis project develops a dense array fNIR/EEG neuroimaging system for use in operational environments. Miniature NIR-enhanced optical emitters and detectors are combined with EEG and EIT (Electrical Impedance Tomography) electrodes embedded in a novel,flexible and wireless, geodesic head web. This device integrates all interconnect for power and signal within the flexible geodesic tension structu ...
SBIR Phase I 2003 Department of DefenseDefense Advanced Research Projects Agency -
Photonic Crystal Chip-scale Optical Networks
SBC: EM PHOTONICS INC Topic: N/AAs the clock speeds of integrated circuits continue to increase, the technological limits of all-electrical interconnects are becoming the overwhelming limit to system performance. In particular, over 80% of the latency in current ICs is due tointerconnect limitations. Moreover, current processors are requiring operational powers in excess of 100 Watts with I/O, on-chip interconnections, and clo ...
STTR Phase I 2003 Department of DefenseAir Force -
Rigorous Analysis and Design of Nano-Photonic Devices using a Novel Hardware Approach
SBC: EM PHOTONICS INC Topic: N/AA nearly universal trend in modern technology is integrating systems, and their associated devices, on decreasingly smaller scales. Examples range from complete telecommunication systems on a chip to implantable medical devices smaller than human cells.The majority of these devices apply hybrid designs that integrate on a commensurate scale electronics with active and passive optical components. ...
SBIR Phase I 2003 Department of DefenseDefense Advanced Research Projects Agency -
System Integration Toolsets for Rapid Evaluation of New Propulsion Systems
SBC: ENGINEOUS SOFTWARE Topic: N/AMany diverse tools are used for the evaluation of propulsion systems from different engineering disciplines. These include legacy codes, off the shelf analysis software such as ANSYS, MathLab a variety of CFD tools, and miscellaneous utilities such asExcel. Engineous Software proposes to investigate integration of diverse propulsion analysis tools into a design system or framework. Such a syste ...
SBIR Phase I 2003 Department of DefenseAir Force -
Time-Exposure Acoustics for Imaging Underground Structures
SBC: GEOPHEX, LTD. Topic: N/AWe propose to further develop a new technique for imaging underground facilities based on the passive monitoring of acoustic emissions from both stationary and moving equipment within such facilities. It is well known that all mechanical devices, such asmotors, gears, etc, emit acoustic signals. It is possible to identify an acoustic source based on its noise spectrum. During Phase I, we have demo ...
STTR Phase II 2003 Department of DefenseAir Force