You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A CAD-Programmable Environment for Developing CBM Systems for Rotorcraft

    SBC: ADVANCED STRUCTURAL TECHNOLOGY, INC.            Topic: N/A

    The objective of the Phase II research is to utilize the lessons learned from the Phase I risk reduction work to develop a prototype CAD-programmable environment for the development of condition-based maintenance systems for rotorcraft. This developmentenvironment features a CAD scenario modeler for constructing, via click n' drag modeling, fault-to-failure damage models which can account for the ...

    SBIR Phase I 2003 Department of DefenseOffice of the Secretary of Defense
  2. A CAD-Programmable Environment for Developing CBM Systems for Rotorcraft

    SBC: ADVANCED STRUCTURAL TECHNOLOGY, INC.            Topic: N/A

    The objective of the Phase II research is to utilize the lessons learned from the Phase I risk reduction work to develop a prototype CAD-programmable environment for the development of condition-based maintenance systems for rotorcraft. This developmentenvironment features a CAD scenario modeler for constructing, via click n' drag modeling, fault-to-failure damage models which can account for the ...

    SBIR Phase II 2003 Department of DefenseOffice of the Secretary of Defense
  3. Advanced Ureteroscopy Simulation Workstation for Medical

    SBC: IMMERSION MEDICAL, INC.            Topic: N/A

    This Phase II proposal describes the development of a comprehensive, field-ready, computer-based simulation for training in therapeutic ureteroscopy. Built on a foundation for simulating diagnostic ureteroscopy, the Phase II design combines elements fromtwo recently advanced simulation platforms for training in operative hysteroscopy and endovascular procedures. Primary hardware challenges include ...

    SBIR Phase II 2003 Department of DefenseOffice of the Secretary of Defense
  4. ANALOG/VIDEO COMMUNICATIONS LINK

    SBC: WINDERMERE INFORMATION TECHNOLOGY SYSTEM            Topic: N/A

    The Analog/Video Communications Link can be used by fielded soldiers for data/voice transfer to fellow soldiers or as a link for gathering data from remotely located sensors. Phase I of this effort produced a preliminary hardware design for two CardTransceiver (CXCVR) versions, one with a PCI interface and the other with a PCMCIA interface, a Sensor Transceiver (SXCVR), and a base station compute ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  5. Antenna Enhancements for SOF Applications

    SBC: SYNTONICS LLC            Topic: N/A

    Syntonics will investigate and design a suite of tactical line-of-sight (LOS) antennas using some or all of these potential antenna configurations: Collapsing (

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  6. Computer-based Simulation Technology for Training Technical

    SBC: SIMQUEST INTERNATIONAL, LLC            Topic: N/A

    This project will develop a `Simulation Training and Evaluation Platform (STEP)' that will provide combat medics, emergency medical technicians (EMTs), nurses and physicians with an integrated simulation environment for initial and refresher training inlife-saving procedures. A primary objective of the research will be the development of a scaleable Learning Management System that can support a ra ...

    SBIR Phase II 2003 Department of DefenseOffice of the Secretary of Defense
  7. Direction Finding (DF) Module

    SBC: APPLIED SIGNAL & IMAGE TECHNOLOGY, INC.            Topic: N/A

    The SOCOM direction finding (DF) requirement is a small, low-power package that is modular in design and capable of interoperating with a variety of receivers including the SIGINT Threat Warning receivers currently under development by Digital ReceiverTechnology, Inc. and Applied Signal Technology, Inc. Applied Signal and Image Technology is uniquely positioned to offer SOCOM a solution for this ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  8. Emitter Geolocation

    SBC: WINDERMERE INFORMATION TECHNOLOGY SYSTEM            Topic: N/A

    SOF tactical users currently lack a small, dynamic package with the capability to geolocate emitters that they may encounter, while stationary or on-the-move, in the course of their missions. Through the development of such a package, and integration withother components of the SOF tactical Joint Threat Warning System (JTWS)

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  9. HF to UHF Camouflaged Antenna

    SBC: WINDERMERE INFORMATION TECHNOLOGY SYSTEM            Topic: N/A

    The highly dynamic and unpredictable nature of today's military missions and terrorist threats is a tremendous challenge and source of vulnerability for the modern SOF war fighter. Providing timely and accurate information to the war fighter isexacerbated by the ever-evolving landscape of signals, transmitters, and unique operational settings.The Windermere Group, a small business based in Maryla ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  10. Monitor for Risk of Structural Collapse

    SBC: Sekos, Inc.            Topic: N/A

    The focus of this SBIR submission is to develop a system to monitor fire-induced structural vibrations that provide real time data correlating with structural integrity. The system is designed to bridge an "information void" that would provide firefighters with information that can warn of impending collapse. The system, based on accelerometer technology, will monitor structural integrity through ...

    SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government