You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Physiological Monitoring in Swimmers and Divers

    SBC: PinMed, Inc.            Topic: A234004

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  2. AIExploit: automated detection of exploits in AI/ML models for red team penetration testing

    SBC: YRIKKA, INC.            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  3. The Coin of the Realm: Understanding and Predicting Relative System Behavior

    SBC: MORE COWBELL UNLIMITED, INC            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  4. ATAK Smart Garments for Automatic Wound Detection (Shot, Shrapnel, Cut) and Treatment

    SBC: LEGIONARIUS LLC            Topic: A224017

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  5. Noise Masked Communication System (NMCS)

    SBC: NOKOMIS INC            Topic: A22003

    The proposal offers solution to the problem of covert communication. The suggested solution is based embedding data in Additive White Gaussian Noise (AWGN) with Signal to Noise Ratio (SNR) to be in range from -5 to -20 dB. To embed the data and extract it without loss a method of Singular Spectrum Analysis.  Nokomis solution meets the goals formulated in the solicitation: it is Noise Masked; it i ...

    SBIR Phase I 2023 Department of DefenseArmy
  6. Production of Lithium Salts for Li ion Batteries Using Thermal and Cyclonic Brine Concentration Espiku LLC

    SBC: ESPIKU LLC            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  7. Solid State High Energy Density Batteries

    SBC: FRAMERGY INC            Topic: SOCOM222001

    Modern lithium ion batteries are known for their poor safety performance, with many reports of battery failure and fire having been reported. One of the major causes of battery fire is from the use of flammable solvents, such as organic carbonates, as the electrolyte. These hazards have long limited the usage of batteries in dangerous conditions, such as on the battlefield. To combat this issue, t ...

    SBIR Phase II 2023 Department of DefenseSpecial Operations Command
  8. Rapid Chemical Vapor Threat Mapping with Cooperative Ground and UAS Sensors

    SBC: MESH INC            Topic: A10AT022

    A single, ground-based, passive, standoff chemical agent vapor sensor cannot map a chemical vapor cloud because passive sensors only measure direction and not range to vapor clouds. It is not always possible, especially for a ground vehicle mounted standoff sensor, to have additional ground-based sensors at favorable vantage points to assist in threat mapping. The objective of the proposed effort ...

    STTR Phase II 2023 Department of DefenseArmy
  9. Strados Remote Electronic Stethoscope Platform for Physiological Monitoring

    SBC: STRADOS LABS, INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  10. Strados RESP Biosensor for Respiratory and Fatigue Monitoring

    SBC: STRADOS LABS, INC            Topic: A224025

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government