You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Strategies for providing evidence-based learning opportunities

    SBC: ANALYTIC FOCUS, LLC            Topic: N/A

    This SBIR Phase I project will develop an evidence-based approach to maximize learning for K-12 students and predict learning outcomes. We propose to analyze data at multiple levels, including individual and group assessment data, and characteristics of the student, teacher, principal, and school. Using this data, we will categorize performance levels, determine the strengths and weaknesses of t ...

    SBIR Phase I 2006 Department of Education
  2. Miniature Unmanned Aerial Vehicle (MUAV)

    SBC: System Dynamics International Incorporated            Topic: SOCOM05011

    The U.S. Special Operations Command (USSOCOM) has identified a need to develop a miniature unmanned air vehicle (MUAV) that can be launched from an airborne platform by a single crewman and subsequently transmit real-time video images for gathering intelligence, surveillance, and reconnaissance (ISR) information. The MUAV will provide real-time combat identification information in difficult to ob ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  3. Low-Cost, Networked, Disposable Chemical Sensor

    SBC: STREAMLINE AUTOMATION LLC            Topic: SOCOM05010

    There is an acute need for a networked chemical sensor that is inexpensive enough to allow it to be treated as a disposable item - deployed and left in-place until the end of its useful life, or until operations move out of communications range. Electrochemical microarray sensors can be fabricated at low enough unit cost to make the development of a disposable sensor node feasible. These sensors ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  4. Individual Cooling Equipment

    SBC: CESARONI TECHNOLOGY INCORPORATED            Topic: SOCOM06009

    Military ground mobility vehicles often operate in areas of high heat with no environmental conditioning systems for cooling the individual soldier or critical vehicle electronic systems. Typical vehicle climate control systems are large refrigerant-based systems that are not man portable. SOCOM has expressed a desire for cooling equipment that is man portable for short periods (~ 3 hours). Thi ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  5. Automated Feature Extraction Capabilities for the Development of High-Resolution GEOINT Feature Data and Constructing Correlated Databases

    SBC: CG2, Inc.            Topic: SOCOM06012

    Our solution to the automated feature extraction problem will leverage the material properties that can be inferred from combining multispectral imagery with high resolution elevation data or LIDAR data using a trainable knowledge base. Multiple imaging bands provide a more complete picture of the material involved than ordinary RGB. This can help distinguish between a green grass lawn and a gre ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  6. Universal Longwire Antenna Module for Unmanned Aerial Vehicles and Aircraft

    SBC: MANAGEMENT SERVICES GROUP, INC.            Topic: SOCOM06003

    In this Phase I effort, Global Technical Systems (GTS) proposes to research and develop a concept for a lightweight airborne Universal Longwire Antenna Module (ULAM) to be used for broadcasting Psychological Operations (PSYOPS) in the commercial AM and Short Wave bands at high or low power. The lightweight design enables installation on a wide variety of manned and unmanned aircraft.

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  7. Why Go It Alone? The Use of Public Resources to Enhance Computer Accessibility for Individuals with Cognitive Disabilities

    SBC: Life Technologies            Topic: N/A

    Individuals with cognitive disabilities represent one of the fastest growing disability groups in the U. S. The potential for computer technology to increase social integration for this population is well-documented. However, cognitive and financial barriers frequently preclude the acquisition and maintenance of personal computer hardware, software programs, and Internet service. The Personal Ac ...

    SBIR Phase I 2006 Department of Education
  8. Why Go It Alone The Use of Public Resources to Enhance Computer Accessibility for Individuals with Intellectual Disabilities

    SBC: Life Technologies            Topic: N/A

    The Personal Access Computer Key a modified Universal Serial Bus designed to accommodate adaptive software capable of being launched on publicly accessible updated computers

    SBIR Phase I 2006 Department of Education
  9. My Scrivener Innovative Technology to Enhance Fine Motor Function

    SBC: Obslap Inc            Topic: N/A

    A prototype special education intervention called My Scrivener based on emerging research demonstrating that computer assisted motion training can stimulate the growth of neural connections.

    SBIR Phase I 2006 Department of Education
  10. Door Breaching Ammunition

    SBC: POLYSHOK, INC.            Topic: SOCOM05002

    Using Polyshok patented technology, Polyshok, Inc. will complete the development of the high performance door breaching round started in Phase I and make it production ready. In addition the manufacturing technology will be developed to produce this 12 gauge ammunition on commercial high speed loading equipment. All M1030 US Army 12 gauge Door Breaching performance requirements will be met as par ...

    SBIR Phase II 2006 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government