You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Improved Silicon Drift Detector Coincidence Rejection for Digital Pulse Processors
SBC: 4pi Analysis, Inc. Topic: N/AThe recent emergence of the Silicon Drift detector (SDD), for use in Energy Dispersive x-ray Spectroscopy (EDS), has made possible x-ray event streams with input count rates in the range of 1-10 Mcps. Modern digital pulse processors are therefore required to run at fast time constants to achieve reasonable throughput; however, this causes significant coincidence artifacts to appear in the spectrum ...
SBIR Phase I 2008 Department of CommerceNational Institute of Standards and Technology -
Deep Submergence Rated Flexible Hoses and Piping System Connectors
SBC: MEI-CHARLTON, INC. Topic: SOCOM08002The objective of this proposal is to demonstrate the feasibility of developing flex hoses for hydraulic and other piping system interfaces that can withstand high pressure environments, hydrodynamic, and other forces unique to deep submergence system operating environments. This hose and connecter system coined FlexiHOSE© proposed by MEI-Charlton, Inc. (MEIC) will meet the need of operating under ...
SBIR Phase I 2008 Department of DefenseSpecial Operations Command -
Engineering Models for Damage to Structural Components Subjected to Internal Blast Loading
SBC: PROTECTION ENGINEERING CONSULTANTS LLC Topic: DTRA08006The team of Protection Engineering Consultants (PEC) and Applied Research Associates (ARA) will develop a fast-running methodology that predicts damage levels of structural members subject to the blast environment from high explosives detonated inside a building (i.e., internal explosions). The research in Phase I will focus on reinforced concrete slab components. The methodology will consist of a ...
SBIR Phase I 2008 Department of DefenseDefense Threat Reduction Agency -
RBAC-Based Workflow
SBC: Virtual Globe, Inc. (Rockwise) Topic: N/AUnder this proposal, Virtual Global, Inc. proposes to work with NIST to develop RBAC-BASED WORKFLOW, a workflow system that will use RBAC in a web services model as a form of middleware that can be "packaged" accessed, configured, and reused by integrating with existing trusted RBAC implementations.
SBIR Phase I 2008 Department of CommerceNational Institute of Standards and Technology -
Efficient Low-Dark-Count Detector for Photon Counting
SBC: VOXTEL, INC. Topic: N/AVoxtel proposes to develop fiber-coupled near-infrared avalanche photodiode (APD) receivers with photon detection efficiency (PDE) and dark count rate (DCR) with more than two orders of magnitude faster maximum count rate (MCR) than Geiger-mode APDs, which are constrained by a fundamental tradeoff between DCR and MCR: if the APD is cooled to reduce DCR, then its dead time must increase to avoid af ...
SBIR Phase I 2008 Department of CommerceNational Institute of Standards and Technology -
Miniature Netted Sensors
SBC: WILLIAMSRDM, INC. Topic: SOCOM06015Williams-Pyro is developing an AccuTag Miniature Surveillance and Tracking System (Accu-MiSTS). Accu-MiSTS employs cluster management techniques and ad-hoc networking to provide a readily scalable architecture with which to perform comprehensive surveillance. A cluster comprises one supernode and up to 65,536 nodes, all of which are within the communication range of at least one other node. The Ac ...
SBIR Phase II 2008 Department of DefenseSpecial Operations Command -
Neutralization Without Detonation of IEDs in the Field
SBC: Energetic Materials & Products, Inc. Topic: DTRA06007In this Phase I SBIR project for the DTRA, Energetics Materials and Products Inc (EMPI) of Austin, Texas, will develop an innovative technology to neutralize Improvised Explosive Devices (IEDs) without detonation or risk to personnel. Neither detonation nor defusing, the two methods currently available to neutralize IEDs, provide acceptable risk. Detonating the device is seldom practical in an u ...
SBIR Phase I 2006 Department of DefenseDefense Threat Reduction Agency -
Construction of a Force Probe for Characterization of Microscale Features
SBC: INSITUTEC, INC. Topic: N/AThe Phase 2 objective is to provide NIST with a modular gauge head unit equipped with InsituTec's standing wave probe technology. The complete gauge head unit will be retrofitted to the NIST M48 which is one of the most precise measuring machines in the world. This unit will enable NIST to achieve the agency's program goal in dimensional metrology which is to provide microscale measurement capacit ...
SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology -
HIGH EFFICIENCY COMPACT MODELING OF RADIATION EFFECTS
SBC: Lynguent, Inc. Topic: DTRA05001The objective of this research is to develop beta versions of tools for automatically migrating radiation effects predicted in TCAD level tools to compact modeling tools. This transition will enable compact models that possess radiation effects to be quickly generated, which can then be used in circuit design activity. This approach is a substantial improvement over the current ad hoc approaches. ...
SBIR Phase II 2006 Department of DefenseDefense Threat Reduction Agency -
Distributed Automatic Reconfigurable Transponder (DART)
SBC: WILLIAMSRDM, INC. Topic: N/AWilliams-Pyro, Inc. (WPI) has designed and successfully demonstrated a proof-of-concept of the Distributed Automatic Reconfigurable Transponder (DART) that will be capable of achieving distributed multi-nodal voice/data communication for fire fighters. In Phase 2 we will focus on developing a fully functional system that reduces communication failure while maintaining a robust and flexible system. ...
SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology