You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Universal Longwire Antenna Module for Unmanned Aerial Vehicles and Aircraft
SBC: MANAGEMENT SERVICES GROUP, INC. Topic: SOCOM06003In this Phase I effort, Global Technical Systems (GTS) proposes to research and develop a concept for a lightweight airborne Universal Longwire Antenna Module (ULAM) to be used for broadcasting Psychological Operations (PSYOPS) in the commercial AM and Short Wave bands at high or low power. The lightweight design enables installation on a wide variety of manned and unmanned aircraft.
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Door Breaching Ammunition
SBC: POLYSHOK, INC. Topic: SOCOM05002Using Polyshok patented technology, Polyshok, Inc. will complete the development of the high performance door breaching round started in Phase I and make it production ready. In addition the manufacturing technology will be developed to produce this 12 gauge ammunition on commercial high speed loading equipment. All M1030 US Army 12 gauge Door Breaching performance requirements will be met as par ...
SBIR Phase II 2006 Department of DefenseSpecial Operations Command -
Individual Cooling Equipment
SBC: CESARONI TECHNOLOGY INCORPORATED Topic: SOCOM06009Military ground mobility vehicles often operate in areas of high heat with no environmental conditioning systems for cooling the individual soldier or critical vehicle electronic systems. Typical vehicle climate control systems are large refrigerant-based systems that are not man portable. SOCOM has expressed a desire for cooling equipment that is man portable for short periods (~ 3 hours). Thi ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Task-based Interactive Language and Culture Trainer
SBC: VCOM3D INC Topic: SOCOM06010For this Phase I SBIR project, we will identify promising, task-based instructional strategies for teaching foreign languages and cultures using authentic, interactive training vignettes. Using a standards-based framework for authoring and delivery, we will create proof-of-concept vignettes that place the learners in realistic situations in which they must try to elicit information from, or influ ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Miniature Unmanned Aerial Vehicle (MUAV)
SBC: System Dynamics International Incorporated Topic: SOCOM05011The U.S. Special Operations Command (USSOCOM) has identified a need to develop a miniature unmanned air vehicle (MUAV) that can be launched from an airborne platform by a single crewman and subsequently transmit real-time video images for gathering intelligence, surveillance, and reconnaissance (ISR) information. The MUAV will provide real-time combat identification information in difficult to ob ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Multi-Spectral Low-Light Imaging
SBC: CANVS CORP. Topic: N/ABased on the extensive theoretical and experimental studies carried out in support of the CANVS/SOCOM Phase-I contract, CANVS has determined what hardware it will deliver under the Phase-II effort. The proposed system configurations were arrived at througha series of decisions taking into account form, fit, function, and the ability for rapid transition into production.
SBIR Phase II 2003 Department of DefenseSpecial Operations Command -
V-PSL and VISI_PSL: A Visual Language and Interactive Tool for PSL Generation
SBC: Computer Aided Process Improvement, Inc. Topic: N/AWe propose developing a prototype of a GUI-based wizard that: ¿ Guides users through the steps that are needed to define their processes using PSL in a visual/textual manner. ¿ Checks for consistency/correctness according to PSL ontology. ¿ Generates the PSL description. We believe that VISI-PSL will facilitate the generation of PSL descriptions to the extent that it will be used by process ...
SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology -
Construction of a Force Probe for Characterization of Microscale Features
SBC: INSITUTEC, INC. Topic: N/AThe Phase 2 objective is to provide NIST with a modular gauge head unit equipped with InsituTec's standing wave probe technology. The complete gauge head unit will be retrofitted to the NIST M48 which is one of the most precise measuring machines in the world. This unit will enable NIST to achieve the agency's program goal in dimensional metrology which is to provide microscale measurement capacit ...
SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology -
Tool Condition Monitoring and Diagnostics
SBC: VulcanCraft Topic: N/AA smart machine tool must be able to monitor its condition and report problems. Every CNC machine should provide an alarm for tool condition problems, including tool wear, much as every automobile has a low oil indicator. Tool wear is particularly important for unattended machining as a worn tool can ruin a part. All current tool condition systems operate "blind" without direct information on curr ...
SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology