You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Hardware Based Broadband Ultra High-speed Digital Signal Processor
SBC: S2 CORPORATION Topic: AF112142ABSTRACT: S2 Corporation and subcontractor Research Associates of Syracuse aim to develop a broadband hardware-based ultra high-speed signal processor for real time digital, broadband RF spectrum over 2-18 GHz with digital signal stream captures and analysis for a countermeasure applications, and to demonstrate these digital algorithms to significantly advance the tactical capability through comp ...
SBIR Phase II 2013 Department of DefenseAir Force -
ADIDRUS: Using Deception to Protect and Defend UAVs
SBC: GALOIS, INC. Topic: OSD11IA2Unmanned vehicles are becoming an increasingly valuable tool within the Department of Defense, and related technologies are beginning to appear in commercial systems. As their utilization grows, these unmanned systems will become a significant target for cyber attack. Indeed, existing Defense Department unmanned aerial vehicles (UAVs) have already been subjected to attack by various adversaries. ...
SBIR Phase II 2013 Department of DefenseAir Force -
Satellite Optical Backplane
SBC: EM PHOTONICS INC Topic: AF103097ABSTRACT: there is a clear need for a radically new interconnect architecture that minimizes the routing delay through the backplane to enable increased performance, reduced costs, and faster time to market. To this end, we propose the development of a space compatible optically interconnected backplane with reconfigurable routing fabric. By removing the electrical interconnections between logi ...
SBIR Phase II 2013 Department of DefenseAir Force -
Development of a Long Term pH and pCO2 Lagrangian Drifter
SBC: SUNBURST SENSORS, LLC Topic: 831CQuantifying oceanic CO2 uptake and ocean acidification and understanding their impact on global climate and ocean ecology are key goals of NOAA’s climate change research programs. NOAA’s request for Development of a long-term Lagrangian pH and pCO2 drifter (SBIR Subtopic 8.3.1C) aims to address these goals by developing technology that measures both pCO2 and pH that can be widely deployed in t ...
SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration -
Abrasion and Impact Resistant Hydrophobic Thermoplastic Coatings for Aircraft Landing Skis/Skids
SBC: RESODYN CORPORATION Topic: AF103256ABSTRACT: Resodyn Corporations proposed Functionalized Polyethylene (FPE) copolymer thermoplastic coating will overcome the shortcomings of the current ski coating. The FPE will provide the long-lasting, low friction, impact-resistant, abrasion resistant and hydrophobic properties required and will also provide hydraulic fluid resistance and reduced drag during wet snow conditions. Enhancements ...
SBIR Phase II 2013 Department of DefenseAir Force -
Highly-Scalable Computational-Based Engineering Algorithms for Emerging Parallel Machine Architectures
SBC: SCIENTIFIC SIMULATIONS, LLC Topic: AF10BT13ABSTRACT: In order to significantly advance the fidelity and capability of current computational engineering tools, algorithms, techniques, and software which map effectively to emerging massively parallel hardware architectures must be developed. The objective of this project is to investigate and demonstrate specific techniques for enhancing the scalability of computational fluid dynamics (CFD) ...
STTR Phase II 2013 Department of DefenseAir Force -
Improved Hyperspectral Readout Integrated Circuit
SBC: VOXTEL, INC. Topic: AF112135ABSTRACT: To increase the performance of current and next-generation imaging spectrometers for military applications, in this Phase II SBIR effort, a flexible readout integrated circuit (ROIC), optimized for hyperspectral imaging (HSI) will be developed with enhanced capabilities. The ROIC features a 1024 (spatial) x 512 (spectral) format, with 20 micron pitch pixel elements, and has been develop ...
SBIR Phase II 2013 Department of DefenseAir Force -
Optimized Taggant Delivery Systems
SBC: VOXTEL, INC. Topic: AF112002ABSTRACT: In this Phase II SBIR, a Voxtel Inc. led team will develop a lightweight small unmanned aircraft system (SUAS) delivered payload, including targeting and fire-control sub-system, taggant dissemination hardware, and taggant reservoir, that is capable of covertly delivering optical taggants. Because the performance of auto-pilots and video trackers is limited by SRPA system constraints, t ...
SBIR Phase II 2013 Department of DefenseAir Force -
Packaging High Power Photodetectors for 100 MHz to 100 GHz RF Photonic Applications
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: AF131142ABSTRACT: In this SBIR effort we will develop a packaging process and demonstrate (Phase I) a prototype of high power Photodiode (PD) that has a normal incident, pigtailed fiber input and a coaxial RF output that operates from DC to>60GHz. We will apply and extend (Phase II) the aforementioned packaging process to single PD, balanced PD and array of PDs that work from DC through entire W-band. De ...
SBIR Phase I 2013 Department of DefenseAir Force -
"Night Glow"Short Wave Infrared LED (NSLED) Image Projector Development
SBC: Chip Design Systems Inc. Topic: AF131098ABSTRACT: This project aims to develop a Short Wave Infrared band image projector to provide real time detector stimulation with high dynamic range. Our emitter technology is based on GaInAsSb quaternary semiconductor LED arrays hybridized to CMOS read-in integrated circuits. This project leverages read-in circuit design and control electronics that were developed under SLEDS - a longer wavelengt ...
SBIR Phase I 2013 Department of DefenseAir Force