You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of a Long Term pH and pCO2 Lagrangian Drifter

    SBC: SUNBURST SENSORS, LLC            Topic: 831C

    Quantifying oceanic CO2 uptake and ocean acidification and understanding their impact on global climate and ocean ecology are key goals of NOAA’s climate change research programs. NOAA’s request for Development of a long-term Lagrangian pH and pCO2 drifter (SBIR Subtopic 8.3.1C) aims to address these goals by developing technology that measures both pCO2 and pH that can be widely deployed in t ...

    SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  2. ASP Motion Base for Stabilized Mounts

    SBC: Flex Force Enterprises Inc.            Topic: A12079

    The flexFORCE engineering team has completed assessment of the critical technical factors required for successful ASP deployment (weight, pointing accuracy, control response, actuation power required, failure modes and effects, scalability, and manufacturability). The team has evaluated the ASP operational environment and requirements, developed a preliminary system design, and executed both dyna ...

    SBIR Phase II 2013 Department of DefenseArmy
  3. DYNAMICALLY PROGRAMMABLE AND ADAPTIVE MULTI-BAND COMPRESSIVE IMAGING SYSTEM

    SBC: Bridger Photonics, Inc.            Topic: A11aT007

    Bridger Photonics, Inc. and the University of Arizona have successfully demonstrated a Phase I dynamically programmable multi-band compressive imaging system. The team demonstrated three key technical concepts that prove the feasibility of this powerful technology: 1. Advanced algorithms were used to develop compressive measurement basis sets for imaging and target classification. The algorithms ...

    STTR Phase II 2013 Department of DefenseArmy
  4. Tools for Rapid Automated Development of Expert Models (TRADEM)

    SBC: EDUWORKS CORPORATION            Topic: A12026

    Intelligent tutoring systems (ITS) are complex adaptive learning systems that simulate one-on-one tutoring. Research shows they improve learning and reduce time to mastery. Unfortunately, they are also expensive and time-consuming to produce. Existing IT authoring tools eliminate low level programming but require that domain models, expert models and content be created manually. In Phase I of t ...

    SBIR Phase II 2013 Department of DefenseArmy
  5. Non-Destructive Evaluation (NDE) and Testing of Ceramic Armor

    SBC: EVISIVE LLC            Topic: A07186

    This project will develop a field portable nondestructive technique for in-situ monitoring of the health of ceramic armor. The Evisive Scan microwave interference scanning method has been successfully demonstrated in Phase I of the project, where it was demonstrated successfully on Control Specimens and ceramic armor Surrogates designed and fabricated by ARL, and on samples of armor from Stryker ...

    SBIR Phase II 2009 Department of DefenseArmy
  6. Ultra-High Temporal Resolution Laser Radar (LADAR) Receiver

    SBC: VOXTEL, INC.            Topic: A07080

    Voxtel will develop a prototype ultra-high temporal resolution flash LADAR receiver suitable for unmanned ground vehicle (UGV) or unmanned air vehicle (UAV) applications, based upon its low-excess-noise, multi-stage avalanche photodiode (APD) technology. During the Phase I program, 5-stage InGaAs APDs where shown to have a multiplication noise characterized by k=0.02 at a gain of M=20 (20× lower ...

    SBIR Phase II 2009 Department of DefenseArmy
  7. High Efficiency Up conversion Single-Photon-Detector for 1550 nm Signal

    SBC: ADVR, INC.            Topic: N/A

    This NIST Phase II SBIR effort will two low noise single photon detectors using MgO doped LiNbO3 (LN) periodically poled waveguides and a 980nm (or similar appropriate wavelength) pump to up convert 1550nm photons to 600nm to allow for detection by photomultiplier tube (PMT). The key innovation is using low noise periodically poled waveguides with a long wavelength (1800nm) pump leading to higher ...

    SBIR Phase II 2009 Department of CommerceNational Institute of Standards and Technology
  8. Non-Destructive Evaluation (NDE) and Testing of Ceramic Armor

    SBC: EVISIVE LLC            Topic: N/A

    This project will develop a field portable nondestructive technique for in-situ monitoring of the health of ceramic armor. The Evisive Scan microwave interference scanning method has been successfully demonstrated in Phase I of the project, where it was demonstrated successfully on Control Specimens and ceramic armor Surrogates designed and fabricated by ARL, and on samples of armor from Stryker ...

    SBIR Phase II 2009 Department of DefenseArmy
  9. Efficient Low-Dark-Count Detector for Photon Counting

    SBC: VOXTEL, INC.            Topic: N/A

    Voxtel has demonstrated efficient high-speed photon counting with thresholded linear-mode avalanche photodiode (APD) receivers using multi-gain-stage InGaAs/InAIAs APDs. In contrast to Geiger APDs, thresholded photon-counting linear APD receivers are thought not to suffer afterpulsing, and can support maximum count rates (MCR) up to 2 or 3 orders of magnitude faster than Geiger APDs. However, the ...

    SBIR Phase II 2009 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government