You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets
SBC: 60Hertz Incorporated Topic: 92This research aims to develop decision support tools for better maintenance and planning of renewable energy generation and storage assets using atmospheric, local weather, and on-ground environmental data blended with site-, regional- and national-generation data. The study will use a combination of these data to understand the relationship between non-cloud cover based atmospheric conditions and ...
SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets
SBC: 60Hertz Incorporated Topic: 92We propose to use Aerosol Optical Depth (AOD) measurements as an early warning system, to cue on-site validation of the soiling station and any available meteorological (MET) station data to validate if a work order to clean deposited particulate matter is necessary. This would move from reactive maintenance – often weeks delayed, to proactive maintenance – getting ahead of the weather impact ...
SBIR Phase I 2022 Department of CommerceNational Oceanic and Atmospheric Administration -
SBIR Phase II: Mobile Plastic Ocean Waste Recycler
SBC: PKS CONSULTING, INC. Topic: 5BPlastic Ocean Waste (POW) is accumulating in our oceans and on our beaches at an accelerating rate. Eight million metric tons (8M MT) of plastic is entering the world's oceans each year at a rate of one ton per minute. Alaska represents 53% of the U.S. coastline. During Phase I, we estimated the amount of POW accumulating on Alaska's shorelines at 34,500 to 51,700 MT/yr at a rate of three ton per ...
SBIR Phase II 2022 Environmental Protection Agency -
Hydrothermal Alkaline Treatment of PFAS Contaminated Water and Groundwater
SBC: Aquagga, Inc. Topic: 20OSAPE3APer-and polyfluoroalkyl substances (PFAS) have been used extensively since the 1940s due to their chemical stability and unique thermophysical properties. Those same properties make PFAS extremely recalcitrant environmental pollutants, and bioaccumulative toxins. Regulations are rapidly being established by U.S. states, including Michigan, New Hampshire, and New Jersey, beholding municipal water u ...
SBIR Phase I 2021 Environmental Protection Agency -
Mobile Plastic Ocean Waste Recycler
SBC: PKS CONSULTING, INC. Topic: 20OSAPE5BThe Environmental Protection Agency is seeking proposals that will improve the U.S. recycling system.PKS Consulting is an Alaska-based small technology firm that proposes the development of a Mobile Plastic Ocean Waste (POW) Recycler that can be moved from community to community to produce Recycled Plastic Lumber (RPL) products from locally collected POW. Fishing gear is primarily composed of Poly ...
SBIR Phase I 2021 Environmental Protection Agency -
SOFTOX FOR STRANDED GAS UTILIZATION
SBC: Modular Chemical, Inc. Topic: 22aMany of today’s oil producers are forced to flare associated natural gas or shut-in wells because they cannot economically bring the gas to market. Natural gas flaring and venting exposes produc- ers to environmental liabilities, reduces potential revenues, and depreciates assets. Initially, this project will focus on a particularly acute problem for many producers—the co-production (with oil) ...
STTR Phase I 2019 Department of Energy -
Production Methods and Software for NIST Calibration Phantoms
SBC: SIGMA K CORP Topic: N/AMagnetic Resonance Imaging data needs to be calibrated using a universal standard. NIST and the ISMRM SQRM committee have developed the NIST/NIST MR phantom. The group had two phantoms manufactured to their specifications and these phantoms have been imaged at numerous imaging facilities. Sigma-K now proposes to develop a complete manufacturing method that will produce 50 MRI phantoms. These phant ...
SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology -
Development of a Scalable, Low-cost, Ultrananocrystalline Diamond Electrochemical Process for the Destruction of Contaminants of Emerging Concern (CECs)
SBC: Advanced Diamond TechNologies, Inc. Topic: EThis Small Business Innovation Research (SBIR) Phase II project will employ the large scale; highly reliable boron-doped ultrananocrystalline diamond (BD-UNCD®) electrodes developed during Phase I project to build and test Electrochemical Anodic Oxidation process (EAOP) cells and systems that can destroy Contaminants of Emerging Concern more economically and effectively than competing AOPs. BD-UN ...
SBIR Phase II 2012 Environmental Protection Agency -
Improving Combustion Efficiency and Emissions for Logistically-Practical and Cost-Sustainable Field Operation of an MSW Burn-Management Unit Specifically Applicable to the Unique Circumstances Faced by the Small, Isolated, and Remote Communities in Alaska
SBC: Tok Welding and Fabrication Topic: N/AApproximately 180 to 225 very remote communities, the bulk inaccessible by road, with populations averaging 200 to 500 people, are located in Alaska for which the open burning of municipal solid waste is prevalent, inevitable, and necessary to minimize environmental health concerns. Other waste management options, including conventional incinerators, are not feasible for this unique population gro ...
SBIR Phase I 2008 Environmental Protection Agency -
Improving Combustion Efficiencyin Remote Alaska Community MSW-Burn Units
SBC: Tok Welding and Fabrication Topic: 07NCERM1Approximately 180 to 225 very remote communities, the bulk inaccessible by road, with populations averaging 200 to 500 people, are located in Alaska for which the open burning of municipal solid waste is prevalent, inevitable, and necessary to minimize environmental health concerns. Other waste management options, including conventional incinerators, are not feasible for this unique population gro ...
SBIR Phase I 2008 Environmental Protection Agency