You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Improved Reactor and Catalyst for Light Alkanes to Olefins and Liquid Fuels
SBC: PRECISION COMBUSTION, INC. Topic: C4722aC47-22a-271388Current manufacturing of ethylene via ethane steam reforming comes with significant energy and carbon emissions costs. A route to low carbon ethylene will have a meaningful impact as ethylene production is the largest world-wide and US chemical process in terms of production volumes, energy consumed, and carbon emitted. This project fits well within an overall strategy for decarboniz ...
SBIR Phase II 2023 Department of Energy -
Secondary Emission Detector Modules for High Energy Physics Experiments
SBC: NVIZIX LLC Topic: C5637aWe propose simulating and constructing a prototype and demonstration brassboard of a Secondary Emission Sensor Module (SESM) for ionizing radiation, as a proof of principle and guide to Phase II and beyond. The simulation and design studies will guide module construction and point to future uses. The module is anticipated to have ~30 stages of sheet dynode with an areal size ~15x15 cm. It will be ...
SBIR Phase I 2023 Department of Energy -
Multifunctional Ceramic Antifouling, Erosion- and Corrosion-resistant Coating for Hydropower Applications
SBC: NANOIONIX, LLC Topic: C5614bHydroelectric power is the world’s largest source of renewable energy. These massive systems are designed for a 50+ year service life, but this can be shortened substantially by poor water quality and the presence of flowing debris, sediment, minerals, and micro- and macro-organisms. Biofouling (especially from invasive species), corrosion, and erosion (wear) of critical components can limit per ...
SBIR Phase I 2023 Department of Energy -
X-RAY SOURCE FOR DETECTOR CALIBRATION
SBC: omega-p r&d, Inc. Topic: C5602aThe US Defense Nuclear Nonproliferation Research and Development agency has an objective to reduce reliance on high-activity commercial and industrial radioactive sources used in calibration systems. One approach to achieve this goal is by use of novel electron accelerators to produce x-rays that can reach the needed gamma-ray dose rate, repeatability, and stability for calibration, while reducing ...
SBIR Phase I 2023 Department of Energy -
Internal Surface Finishing of Additively Manufactured RF Components for Fusion Reactor Applications
SBC: REM CHEMICALS INC Topic: C5629aStatement of the Problem: In a reactor environment, plasma material interaction (PMI) issues associated with radio frequency (RF) coupling structures are similar to those for the first wall and have been identified as a potential problem. A primary challenge is to obtain high power, breakdown resistant density couplers with low loss compatible with fusion plasmas. Advanced manufacturing techniques ...
SBIR Phase I 2023 Department of Energy -
Nanoarray based monolithic contaminant filter for efficient submicron PM and NH3 removal
SBC: 3D ARRAY TECHNOLOGY LLC Topic: C5626eC56-26e-273790The proposed SBIR phase I project aims to develop a new class of low cost nanoarray based monolithic contaminant filter for Clean Hydrogen Production and Separation from Coal Waste, Biomass, MSW and Plastics produced syngas. It is anticipated that the contaminant filter can capture > 95 % of the heavy metal particulate matter (PM) with submicron size and remove > 95 % of NH3 in the s ...
SBIR Phase I 2023 Department of Energy -
Bifunctional nanocatalyst for one step drop-in diesel production using biomass derived syngas
SBC: 3D ARRAY TECHNOLOGY LLC Topic: C5610cC56-10c-273795The proposed SBIR phase I project aims to develop an energy-efficient and sustainable bifunctional nanoarray-based catalyst system that coherently integrates syngas-to-wax hydrocarbons and wax hydrocarbons-to-diesel fuel conversions in a tandem one-step catalytic process for biomass-derived syngas conversion into drop-in transportation hydrocarbons with low aromatic, oxygen, sulfur a ...
SBIR Phase I 2023 Department of Energy -
Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets
SBC: 60Hertz Incorporated Topic: 92This research aims to develop decision support tools for better maintenance and planning of renewable energy generation and storage assets using atmospheric, local weather, and on-ground environmental data blended with site-, regional- and national-generation data. The study will use a combination of these data to understand the relationship between non-cloud cover based atmospheric conditions and ...
SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
Thermally and Chemically Stable Metallic Membranes for H2 Generation with CO2 Capture
SBC: PRECISION COMBUSTION, INC. Topic: C5322aPrecision Combustion, Inc. (PCI) proposes a process-intensified water-gas-shift/metallic-based membrane- reactor (WGS-MR) for modular H2 production from multi-feedstock gasification. This integrated-process concept offers enhanced performance as well as capital, energy, and cost savings. PCI’s WGS-MR produces high purity H2 from gasified coal/biomass blends or reformed natural gas and allows for ...
SBIR Phase I 2022 Department of Energy -
Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets
SBC: 60Hertz Incorporated Topic: 92We propose to use Aerosol Optical Depth (AOD) measurements as an early warning system, to cue on-site validation of the soiling station and any available meteorological (MET) station data to validate if a work order to clean deposited particulate matter is necessary. This would move from reactive maintenance – often weeks delayed, to proactive maintenance – getting ahead of the weather impact ...
SBIR Phase I 2022 Department of CommerceNational Oceanic and Atmospheric Administration