You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Production Methods and Software for NIST Calibration Phantoms
SBC: SIGMA K CORP Topic: N/AMagnetic Resonance Imaging data needs to be calibrated using a universal standard. NIST and the ISMRM SQRM committee have developed the NIST/NIST MR phantom. The group had two phantoms manufactured to their specifications and these phantoms have been imaged at numerous imaging facilities. Sigma-K now proposes to develop a complete manufacturing method that will produce 50 MRI phantoms. These phant ...
SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology