List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Production Methods and Software for NIST Calibration Phantoms

    SBC: SIGMA K CORP            Topic: N/A

    Magnetic Resonance Imaging data needs to be calibrated using a universal standard. NIST and the ISMRM SQRM committee have developed the NIST/NIST MR phantom. The group had two phantoms manufactured to their specifications and these phantoms have been imaged at numerous imaging facilities. Sigma-K now proposes to develop a complete manufacturing method that will produce 50 MRI phantoms. These phant ...

    SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology
  2. N/A

    SBC: IMLACH CONSULTING ENGINEERING            Topic: N/A

    N/A

    STTR Phase I 2000 National Aeronautics and Space Administration
  3. N/A

    SBC: IMLACH CONSULTING ENGINEERING            Topic: N/A

    N/A

    STTR Phase II 2000 National Aeronautics and Space Administration
  4. High Accuracy Modular Thrust Measurement System Utilizing Magnetic Bearings

    SBC: IMLACH CONSULTING ENGINEERING            Topic: N/A

    N/A

    STTR Phase I 1999 National Aeronautics and Space Administration

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government