List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

  1. Advanced Instrumentation for Non-Nulling Stack Velocity Testing

    SBC: AIRFLOW SCIENCES CORPORATION            Topic: None

    Industrial facilities, manufacturing plants, and electric power plants that burn fossil fuels exhaust the combustion products to atmosphere through their smokestacks. Stack pollutant emissions are quantified using manual testing methods developed in the 1960s, which are prone to error if non-axial flow exists in a stack.Recently, NIST has been working on an improved technique of performing 3D flow ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  2. Development of a Neutron-based Nondestructive Test Method for Concrete Petrography and Chemical Analysis

    SBC: TOURNEY CONSULTING GROUP, LLC            Topic: None

    To evaluate the technical feasibility of prompt gamma neutron activation (PGAA) as an alternative to a set of standard destructive tests of concrete petrography including aggregate type, water/cement ratio, aggregate/binder ratio, density, chloride content and chloride bulk diffusion constant; and to determine the specifications for the design of a dedicated commercial laboratory-based PGAA facili ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  3. Dual Plane 3D Compton Scattering Imager with Pixelated CZT Detectors for 1-10MeV Gamma Ray

    SBC: H3D            Topic: None

    Phase I has proven that the current setup achieves better than 8mm spatial resolution for 2.2MeV prompt gammas. However, 1mm spatial resolution presents a significant challenge for the current setup due in part to limited timing resolution and count rate. A new analog ASIC will be developed to replace the current analog ASIC that will have better timing resolution and deliver higher count rates. I ...

    SBIR Phase II 2019 Department of CommerceNational Institute of Standards and Technology
  4. Manufacturing Data Compiler for Visualization Based on Engineering-Driven Machine Learning

    SBC: OG Technologies, Inc.            Topic: NA

    There has been substantial development in data analytics. However, the complex mathematical formulation of “big data analytics” is difficult to populate in general manufacturing plants. There is a need for an SPC-like tool to enable the acceptance of the advanced data analytics and its visualization. The MD Compiler, a tool to bridge the gap between data available and the information demanded ...

    SBIR Phase I 2018 Department of CommerceNational Institute of Standards and Technology
  5. Dual Plane 3D Compton Scattering Imager with Pixelated CZT Detectors for 1-10MeV Gamma Ray

    SBC: H3D            Topic: NA

    A dual plane Compton imager prototype system with large volume pixelated CZT detectors will be built for spectrally resolved MeV gamma ray tomographic applications. These two planes will be operated at independent clocks and they will be synchronized via a common periodical pulse. The common periodical pulse is self-generated so it does not rely on external pulse generator. Each detector will be c ...

    SBIR Phase I 2018 Department of CommerceNational Institute of Standards and Technology
  6. Offshore Wind Energy Resource Siting

    SBC: SEALANDAIRE TECHNOLOGIES, INC.            Topic: 911SG

    Over the last decade, it has been noted that offshore wind energy resource development could prove extensively valuable in many areas of our nation’s growth, including continued diversification of our energy supply, more options for cost-competitive electricity in coastal and Great Lakes regions, and economical stimulation through new and lasting infrastructure development. The challenges associ ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  7. Production Methods and Software for NIST Calibration Phantoms

    SBC: SIGMA K CORP            Topic: N/A

    Magnetic Resonance Imaging data needs to be calibrated using a universal standard. NIST and the ISMRM SQRM committee have developed the NIST/NIST MR phantom. The group had two phantoms manufactured to their specifications and these phantoms have been imaged at numerous imaging facilities. Sigma-K now proposes to develop a complete manufacturing method that will produce 50 MRI phantoms. These phant ...

    SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology
  8. An Integrated Decision Support Framework for Sustainability CAE

    SBC: BIMCON Inc.            Topic: 9050273R

    The objective of this proposal is to establish the feasibility of developing an integrated decision support framework that transforms the current time-consuming and reactive (post completion of final design) sustainability assessment into a proactive CAE approach that enables the ability to revise designs based on performance against selected sustainability targets in the product design process, i ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  9. Decision Support Tools for Sustainable Manufacturing

    SBC: BIMCON Inc.            Topic: 907012R

    Our vision is that of an integrated decision support solution that transforms the current time-consuming and reactive (post-design) sustainability assessment of a product into a proactive approach available in the early design phases. This solution called Sustainability Integrated into Early Design (SIED) will deliver lifecycle sustainability data into early design processes and focus primarily on ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
  10. Decision Support Tools for Sustainable Manufacturing

    SBC: BIMCON Inc.            Topic: N/A

    The objective of this proposal is to establish the feasibility of developing an integrated decision support tool that transforms the current time-consuming and reactive (post-design) sustainability assessment into a real-time, proactive approach available in the early phases of product design. This tool, called Sustainability Integrated into Early Design (SIED), will define and capture lifecycle-w ...

    SBIR Phase I 2010 Department of CommerceNational Institute of Standards and Technology

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government